Development Intent
AtlasHammersmith and FulhamOfficersChristopher May
Case officer · Hammersmith And Fulham Planning

Christopher May.

Active — last recorded decision May 2026

A case officer at Hammersmith And Fulham with an approval rate of 93% across 177 decided planning applications, spanning 13 wards.[1] Decision speed and appeal performance publish when decision notices are ingested.

Planning officer177 decisions93% approvalSave
Hammersmith And Fulham · ward map
Approval rate — by ward
Lower ~68%
Higher ~90%
ShowingAll years · subscriber →across all years on record — a period re-scopes the headline figures and the trend
At a glanceEach metric links to the investigation behind it
All investigations →
177
Applications
2022–26
Approval rate over time — tougher or softer 🔒Dashed line = London average
avg 81%91%202492%2025100%2026
Approval-rate trend is subscriber dataSubscribe to see the trend →
What they decide — by application type
How they compareVersus peers
Approval rate93% · 21st of 45
higher is betterdashed = London avg
Decision time · publishes with decision notices
in development
Appeal overturn · publishes with decision notices
in development
How this officer decides — from their own reports100 officer reports parsed
24%
Approves despite concerns
of approvals record a documented reservation
0%
Negotiated approvals
approvals mentioning revisions/amendments
4%
"On balance" reports
reports using explicit balancing language
85%
Bespoke reasoning
of report text written for the case, not recited
What they write about — vs Hammersmith And Fulham's average officer

Topic mentions per 1,000 words of their own report text (boilerplate stripped), indexed against all parsed Hammersmith And Fulham reports. Attention, not stance.

Transport & parking
2.5× borough avg
Trees & landscape
1.71× borough avg
Daylight & sunlight
1.3× borough avg
Energy & sustainability
1.14× borough avg
Bulk & massing
1.12× borough avg

Mark = borough average (1×). Bar capped at 2×.

How they reason — coded from their reports

May's caseload includes a notable share of retail-to-residential conversions on protected shopping parades alongside standard extensions, and he is one of the few coded officers to run a full numbered section-by-section report structure ([Land Use], [Quality of Accommodation], [Design], [Residential Amenity], [Highways and Transport], [Flood Risk], [Contamination], [Air Quality]) rather than the compressed Key Principle checklist most colleagues use. On rear/side extensions in commercial or mixed-use terraces he treats an established pattern of neighbouring commercial premises already extended to the rear boundary as justifying a similar extension, departing from the residential norm that discourages building up to the rear boundary. He is precise about numeric floorspace retained in conversions (retail sqm before/after, percentage lost) as the basis for a viability finding.

Observable habits

· structures reports as full numbered sections (Land Use, Quality of Accommodation, Design, Residential Amenity, Highways and Transport, Flood Risk, Contamination, Air Quality) rather than a compressed Key Principle checklist

· on mixed-use/commercial terraces, treats a neighbouring pattern of commercial premises already extended to the rear boundary as justifying departure from the usual residential 'no build to rear boundary' norm

· states precise retained/lost retail floorspace in square metres and as a percentage of the total when assessing shopping-parade conversions, rather than a qualitative viability judgement

What their reports consistently look for

· whether a neighbouring pattern of commercial premises already extended to the rear boundary justifies a similar departure from the residential norm

· the precise retail floorspace retained and lost, in square metres and as a percentage, when assessing whether a retail-to-residential conversion is viable

· whether new windows or terraces would be no closer to opposing windows than the existing arrangement, and whether obscure glazing is needed to prevent unacceptable overlooking

Assigned Christopher May on a live case?What they pay attention to, how they reason, and what their reports consistently look for — so you can address it before they raise it.Subscribe to unlock →
In their own words

the application terrace is characterised by commercial premises which have all extended up to the rear boundary, with the exception of No.259 and No.257 New Kings Road. It is therefore considered, as it was previously in 2021, that the side and rear extensions would be in keeping with the existing pattern of development

2023/01052/FUL

Approximately 32sqm of retail space (representing 18% of the total area) would be lost at the rear of the ground floor

2023/01052/FUL

Measured from 100 published Hammersmith And Fulham officer reports written by this officer, with recited policy boilerplate stripped before any counting. These describe how this officer works and writes — they are not outcome predictions. Every quote is from a named public report.

Policy playbook — what this officer cites[3]

The policies this officer cites most in their own reports — times cited across 100 parsed reports. Whether refusals citing each survive appeal isn't traced per policy yet.

DC1Built environment quality and integration
91 times cited
DC4High standard of design for alterations and extensions
89 times cited
HO11Detailed Residential Standards
71 times cited
CC11Noise and Vibration Control for Developments
70 times cited
DC8Heritage and conservation: Buildings at risk
69 times cited
CC3Flood Risk Assessment Requirement
57 times cited
CC4Minimising surface water run-off with Sustainable Drainage Systems
48 times cited
CC2Sustainable Design and Construction in Major Developments
45 times cited
Which policies this officer leans on is subscriber intelligenceSubscribe to unlock →
Decisions by ward

Where this officer's caseload concentrates, 2022–26.[1] Click the map above to focus this page on a ward, or a row to open the ward.

Recent applications
Address
Reference
Type
Outcome
Date
2025/03545/FUL
Full Planning Application
Approved
2026-06-04
2025/03546/LBC
Listed Building Consent
Approved
2026-06-04
2025/03545/FUL
Full Planning Application
Approved
2026-06-04
2025/03546/LBC
Listed Building Consent
Approved
2026-06-04
Full application history locked
Subscribe to see all 177 decisions →
Consultants approved most— subscriber data
1. Jonathan Wright / Planning Solutions (London) Ltd
2. Mr Charles Catto / Catto & Co
3. Ms Dani Schmidt / My-architect
4. Miss Melissa Collaro / Melissa Collaro Design
At a glance
OfficerChristopher May
RolePlanning officer
Experience
Applications177 (2022–26)
Approval rate93%
London approval avg81%
Who decides here
GovernmentMayor of LondonCouncilCommitteeOfficersDecisionsApplicantsInspectorate
Related investigations
When committees overrule officers like this one →
How often members depart from officer recommendations, and how those overrides fare at appeal.
How much gets decided without a committee →
The delegated share by borough and officer — where the real power over decisions sits.
Sources & method
  1. [1]Applications decided, approval rate, per-year trend and ward breakdown — London Borough of Hammersmith And Fulham planning register and published decision notices, 2022–26. · methodology
  2. [2]Appeal overturn and decision-time benchmarks — Planning Inspectorate (PINS) appeal decisions and application date pairs; not yet computed per officer, shown as a dash until they are. · PINS appeals casework
  3. [3]Condition load — mean effective conditions attached to Hammersmith And Fulham decision notices (grant/split), parsed from the published notice text; a borough figure, not yet split per case officer.
  4. [4]"How this officer decides", the policy playbook and all quotes — parsed from 100 published Hammersmith And Fulham officer reports written by this officer, recited policy boilerplate stripped before counting; disposition text coded from their own reasoning with every quote machine-verified verbatim. Descriptive of how they work — not outcome predictions.
Methodology is published in full so every number is traceable to its primary source.