Development Intent
Case officer · Hammersmith And Fulham Planning

Hasna Miah.

Recently active — last recorded decision Sep 2025

A case officer at Hammersmith And Fulham with an approval rate of 96% across 508 decided planning applications, spanning 17 wards.[1] Decision speed and appeal performance publish when decision notices are ingested.

Planning officer508 decisions96% approvalSave
Hammersmith And Fulham · ward map
Approval rate — by ward
Lower ~68%
Higher ~90%
ShowingAll years · subscriber →across all years on record — a period re-scopes the headline figures and the trend
At a glanceEach metric links to the investigation behind it
All investigations →
508
Applications
2021–25
Approval rate over time — tougher or softer 🔒Dashed line = London average
avg 81%97%202294%202396%202499%2025100%2026
Approval-rate trend is subscriber dataSubscribe to see the trend →
What they decide — by application type
How they compareVersus peers
Approval rate96% · 11th of 45
higher is betterdashed = London avg
Decision time · publishes with decision notices
in development
Appeal overturn · publishes with decision notices
in development
How this officer decides — from their own reports284 officer reports parsed
18%
Approves despite concerns
of approvals record a documented reservation
0%
Negotiated approvals
approvals mentioning revisions/amendments
2%
"On balance" reports
reports using explicit balancing language
67%
Bespoke reasoning
of report text written for the case, not recited
What they write about — vs Hammersmith And Fulham's average officer

Topic mentions per 1,000 words of their own report text (boilerplate stripped), indexed against all parsed Hammersmith And Fulham reports. Attention, not stance.

Bulk & massing
1.57× borough avg
Noise & disturbance
1.56× borough avg
Daylight & sunlight
1.44× borough avg
Outlook & amenity
1.37× borough avg
Materials & detailing
1.35× borough avg

Mark = borough average (1×). Bar capped at 2×.

How they reason — coded from their reports

Miah's caseload is heavily weighted toward householder extensions in established terraces, and she is distinctive for citing multiple specific comparable extensions along the SAME street with their own historic application references to establish that a proposal is 'compatible with the established character of the immediate terrace' — often naming three or more precedent addresses in a single paragraph rather than a single comparator. On residential amenity she runs the standard i/ii/iii Key Principle checklist but frequently frames a marginal non-compliance (e.g. depth exceeding guidance) as acceptable where the affected neighbour already has an equivalent extension of their own, treating parity between neighbours as the operative test rather than the absolute guideline figure.

Observable habits

· cites MULTIPLE named comparable extensions along the same street, each with its own historic application reference, to establish an 'established character of the immediate terrace' finding, rather than a single precedent

· treats parity with an existing extension at the specific affected neighbouring property as the operative amenity test when a numeric guideline (e.g. rear depth) is marginally exceeded

· runs the numbered i/ii/iii Housing Standards Key Principle checklist consistently, usually with a short factual justification per criterion (e.g. exact rear garden depth in metres) rather than a bare 'complies'

What their reports consistently look for

· whether several (not just one) directly comparable extensions already exist along the same street, each citable by its own historic application reference

· whether the specific neighbour most affected by a guideline departure already benefits from an equivalent extension of their own

· the precise rear garden depth in metres and whether the 45-degree angle from the rear boundary is infringed

Assigned Hasna Miah on a live case?What they pay attention to, how they reason, and what their reports consistently look for — so you can address it before they raise it.Subscribe to unlock →
In their own words

Planning permission has been granted for similar extensions at No. 8 (Ref. 2017/03960/FUL), No. 22 (Ref. 2020/02094/FUL) and No. 24 (Ref. 2009/02523/FUL) Bowfell Road

2022/00327/FR3

the proposal would only project 1m beyond the rear walls of the adjoining neighbours, this is considered to be a minimal projection that would not result in a sense of enclosure

2022/00271/FUL

Measured from 284 published Hammersmith And Fulham officer reports written by this officer, with recited policy boilerplate stripped before any counting. These describe how this officer works and writes — they are not outcome predictions. Every quote is from a named public report.

Policy playbook — what this officer cites[3]

The policies this officer cites most in their own reports — times cited across 284 parsed reports. Whether refusals citing each survive appeal isn't traced per policy yet.

DC1Built environment quality and integration
261 times cited
DC4High standard of design for alterations and extensions
261 times cited
HO11Detailed Residential Standards
235 times cited
CC11Noise and Vibration Control for Developments
194 times cited
DC8Heritage and conservation: Buildings at risk
172 times cited
CC3Flood Risk Assessment Requirement
131 times cited
CC4Minimising surface water run-off with Sustainable Drainage Systems
130 times cited
CC2Sustainable Design and Construction in Major Developments
125 times cited
Which policies this officer leans on is subscriber intelligenceSubscribe to unlock →
Decisions by ward

Where this officer's caseload concentrates, 2021–25.[1] Click the map above to focus this page on a ward, or a row to open the ward.

Recent applications
Address
Reference
Type
Outcome
Date
2025/01401/FUL
Full Planning Application
2026-04-29
2024/02247/FUL
Full Planning Application
Approved
2026-03-10
2025/01401/FUL
Full Planning Application
2026-04-29
2024/02247/FUL
Full Planning Application
Approved
2026-03-10
Full application history locked
Subscribe to see all 508 decisions →
Consultants approved most— subscriber data
1. Mr architect nuspace / nuspace
2. Mr Luis Nieves / Nieves Design Space Ltd
3. Jonathan Wright / Planning Solutions (London) Ltd
4. Pascal Huser / Pascal Huser Design & Build Ltd
At a glance
OfficerHasna Miah
RolePlanning officer
Experience
Applications508 (2021–25)
Approval rate96%
London approval avg81%
Who decides here
GovernmentMayor of LondonCouncilCommitteeOfficersDecisionsApplicantsInspectorate
Related investigations
When committees overrule officers like this one →
How often members depart from officer recommendations, and how those overrides fare at appeal.
How much gets decided without a committee →
The delegated share by borough and officer — where the real power over decisions sits.
Sources & method
  1. [1]Applications decided, approval rate, per-year trend and ward breakdown — London Borough of Hammersmith And Fulham planning register and published decision notices, 2021–25. · methodology
  2. [2]Appeal overturn and decision-time benchmarks — Planning Inspectorate (PINS) appeal decisions and application date pairs; not yet computed per officer, shown as a dash until they are. · PINS appeals casework
  3. [3]Condition load — mean effective conditions attached to Hammersmith And Fulham decision notices (grant/split), parsed from the published notice text; a borough figure, not yet split per case officer.
  4. [4]"How this officer decides", the policy playbook and all quotes — parsed from 284 published Hammersmith And Fulham officer reports written by this officer, recited policy boilerplate stripped before counting; disposition text coded from their own reasoning with every quote machine-verified verbatim. Descriptive of how they work — not outcome predictions.
Methodology is published in full so every number is traceable to its primary source.