Development Intent
Case officer · Hammersmith And Fulham Planning

Mwansa Tembo.

Active — last recorded decision May 2026

A case officer at Hammersmith And Fulham with an approval rate of 91% across 595 decided planning applications, spanning 19 wards.[1] Decision speed and appeal performance publish when decision notices are ingested.

Planning officer595 decisions91% approvalSave
Hammersmith And Fulham · ward map
Approval rate — by ward
Lower ~68%
Higher ~90%
ShowingAll years · subscriber →across all years on record — a period re-scopes the headline figures and the trend
At a glanceEach metric links to the investigation behind it
All investigations →
595
Applications
2020–26
Approval rate over time — tougher or softer 🔒Dashed line = London average
avg 81%85%202286%202394%202499%202598%2026
Approval-rate trend is subscriber dataSubscribe to see the trend →
What they decide — by application type
How they compareVersus peers
Approval rate91% · 28th of 45
higher is betterdashed = London avg
Decision time · publishes with decision notices
in development
Appeal overturn · publishes with decision notices
in development
How this officer decides — from their own reports310 officer reports parsed
7%
Approves despite concerns
of approvals record a documented reservation
1%
Negotiated approvals
approvals mentioning revisions/amendments
1%
"On balance" reports
reports using explicit balancing language
79%
Bespoke reasoning
of report text written for the case, not recited
What they write about — vs Hammersmith And Fulham's average officer

Topic mentions per 1,000 words of their own report text (boilerplate stripped), indexed against all parsed Hammersmith And Fulham reports. Attention, not stance.

Materials & detailing
1.35× borough avg
Noise & disturbance
1.24× borough avg
Character & heritage
1.16× borough avg
Daylight & sunlight
1.15× borough avg
Flooding & drainage
1.06× borough avg

Mark = borough average (1×). Bar capped at 2×.

How they reason — coded from their reports

Tembo's caseload is dominated by rear/roof extensions and 'pod' dormer conversions, and she is distinctive for explicitly invoking the permitted-development fallback position — arguing that a scheme's modest breach of the Council's 50%-back-addition-coverage guidance is acceptable because the applicant could demolish and rebuild to the same dimensions under permitted development rights anyway, so refusing achieves nothing. She is comfortable naming specific comparable extensions at named neighbouring addresses with their own application references as precedent, and on residential-amenity impact she runs a granular, address-specific 45-degree-angle assessment for each affected neighbour rather than a single borough-wide test, weighing cumulative impact on named individual windows.

Observable habits

· invokes the permitted-development 'fall-back position' explicitly — a scheme that modestly breaches the 50% back-addition coverage guidance is still recommended for approval because the same volume could be built without permission anyway

· names the specific neighbouring address and application reference used as a design precedent (e.g. an existing pod extension at a named adjoining property under its own historic reference) rather than a generic 'similar development exists nearby' statement

· runs the 45-degree-angle/outlook test separately for each individually named neighbouring property and window, rather than applying one borough-wide pass/fail line to the whole application

What their reports consistently look for

· whether the proposal's excess over the Council's 50% back-addition-coverage guidance is offset by a genuine permitted-development fall-back position

· whether a directly comparable pod or mansard extension already exists at a specific named neighbouring address, and under what historic reference

· the precise angle and window-by-window outlook impact on each individually named adjoining property

Assigned Mwansa Tembo on a live case?What they pay attention to, how they reason, and what their reports consistently look for — so you can address it before they raise it.Subscribe to unlock →
In their own words

it is acknowledged that there is the legitimate fall-back position that the development could be demolished and reconstructed from scratch to still comply with permitted development requirements to the same dimensions as currently being applied for

2022/00384/FUL

A similar pod extension exists at adjoining neighbour No.18 which had planning permission under ref 2001/01916/FUL

2022/01011/FUL

Measured from 310 published Hammersmith And Fulham officer reports written by this officer, with recited policy boilerplate stripped before any counting. These describe how this officer works and writes — they are not outcome predictions. Every quote is from a named public report.

Policy playbook — what this officer cites[3]

The policies this officer cites most in their own reports — times cited across 310 parsed reports. Whether refusals citing each survive appeal isn't traced per policy yet.

DC1Built environment quality and integration
285 times cited
DC4High standard of design for alterations and extensions
282 times cited
DC8Heritage and conservation: Buildings at risk
209 times cited
HO11Detailed Residential Standards
206 times cited
CC11Noise and Vibration Control for Developments
176 times cited
DC6Respecting architectural character with replacement windows
145 times cited
CC3Flood Risk Assessment Requirement
109 times cited
CC4Minimising surface water run-off with Sustainable Drainage Systems
101 times cited
Which policies this officer leans on is subscriber intelligenceSubscribe to unlock →
Decisions by ward

Where this officer's caseload concentrates, 2020–26.[1] Click the map above to focus this page on a ward, or a row to open the ward.

Recent applications
Address
Reference
Type
Outcome
Date
P/2026/00485/HH
Householder Application
Approved
2026-05-29
P/2026/00766/HH
Householder Application
Approved
2026-05-21
P/2026/00485/HH
Householder Application
Approved
2026-05-29
P/2026/00766/HH
Householder Application
Approved
2026-05-21
Full application history locked
Subscribe to see all 595 decisions →
Consultants approved most— subscriber data
1. Jonathan Wright / Planning Solutions (London) Ltd
2. Pascal Huser / Pascal Huser Design & Build Ltd
3. Mr Mark Finney / SEB + FIN Architects Ltd.
4. Mr Iain Newsome / M.A. Newsome & Co Ltd
At a glance
OfficerMwansa Tembo
RolePlanning officer
Experience
Applications595 (2020–26)
Approval rate91%
London approval avg81%
Who decides here
GovernmentMayor of LondonCouncilCommitteeOfficersDecisionsApplicantsInspectorate
Related investigations
When committees overrule officers like this one →
How often members depart from officer recommendations, and how those overrides fare at appeal.
How much gets decided without a committee →
The delegated share by borough and officer — where the real power over decisions sits.
Sources & method
  1. [1]Applications decided, approval rate, per-year trend and ward breakdown — London Borough of Hammersmith And Fulham planning register and published decision notices, 2020–26. · methodology
  2. [2]Appeal overturn and decision-time benchmarks — Planning Inspectorate (PINS) appeal decisions and application date pairs; not yet computed per officer, shown as a dash until they are. · PINS appeals casework
  3. [3]Condition load — mean effective conditions attached to Hammersmith And Fulham decision notices (grant/split), parsed from the published notice text; a borough figure, not yet split per case officer.
  4. [4]"How this officer decides", the policy playbook and all quotes — parsed from 310 published Hammersmith And Fulham officer reports written by this officer, recited policy boilerplate stripped before counting; disposition text coded from their own reasoning with every quote machine-verified verbatim. Descriptive of how they work — not outcome predictions.
Methodology is published in full so every number is traceable to its primary source.