Development Intent
Planning AtlasWaltham ForestChingford GreenApplication
Planning Application

260327

1 Forest Side, Chingford, London, E4 6BA

Full / Other PlanningChingford Green ward
Submission
5 Feb 2026
Target
7 May 2026
Decision
7 May 2026
Outcome
Refused
Delegated decisionRefused
7 May 2026
Decided by Lauren Kimpton under delegated powers
Loading map…
Scheme description

Conversion of existing residential building (2x2-bed flats) (Use Class C3), together with construction of new buildings and extensions to provide a two storey residential development with habitable roof space to provide six residential units (1x3-bed dwellinghouse & 2x3-bed, 1x2-bed & 2x1-bed flats)

Why it was refused
Reason 1

The proposed development, by reason of its scale, massing, height, design and layout, would result in an incongruous and visually fragmented form of development that would fail to integrate appropriately with the corner plot or the surrounding streetscape. As such, the proposal is considered to be contrary to Policies D1 and D4 of the London Plan (2021), and Policy 53 of the Waltham Forest Local Plan Part 1 (2024).

Reason 2

The proposed development would result in an unacceptbale impact to the neighbouring occupiers at No. 5-7 Forest Side, specifically through the creation of a harmful sense of enclosure and loss of outlook resulting from an overbearing form of development to the rear of the property. As such, the proposal is considered to be contrary to Policy 57 of the Waltham Forest Local Plan Part 1 (2024).

Reason 3

The proposed layout would result in poor outlook to the proposed units in terms of windows in close proximity to bounary treatments or only having rooflights, compounded by the inadequate sub-standard provision of private amenity space, whereby the proposal would be contrary to Policy 56 of the Waltham Forest Local Plan and Policy D6 of the London Plan (2021), resulting in poor and substandard form of accommodation for the long term health and well-being of future occupiers

Reason 4

The proposal would fail to achieve accessible and adaptable units in line with Building Regulation M4(2) as such it would be contrary to Policy 16 of the LP1 (2024) and Policy D6 of the London Plan (2021).

Reason 5

In the absence of Tree Survey that provides BS5837 categorisation or AMS , there is insufficient detail to assess the potential impact and any mitigation can be achieved for the existing trees, whereby it cannot be confirmed that the development would be in accordance with the requirements of Policy G7 of the London Plan (2021) and Policies 79 and 80 of the Waltham Forest Local Plan LP1 (2024), which seek to ensure long term health and viability of the trees in the interest of protecting the local biodiversity and to ensure long term resilance to tackle climate change.

Reason 6

In the absence of the Small Sites Metric, the application fails to provide sufficient detail to fully assess the biodiversity impacts of the proposal. As such, it does not demonstrate compliance with the requirements of Policy 79 of the Waltham Forest Local Plan LP1 (2024).

Reason 7

Notwithstanding the above reasons, a S278 and S106 agreements are not entered to ensure the development is in compliance with Policy DF1 of the London Plan (2021), Policies 3, 46, 66, 85, 87 and 94 of the adopted Waltham Forest Local Plan LP1 (2024), in relation to the following planning obligations requirements: S278 Agreement for highway related works, to be paid by developer and implemented by Local Highway Authority: Renewal of the footway and road markings along Whitehall Road and Forest Side Review of waiting and loading restrictions on both Whitehall Road and Forest Side Financial contribution of £750.00 towards monitoring of the Construction Logistics Plan Carbon Offset Fund. Financial contribution of £3,900.00 towards Strategic Access Management and Monitoring Strategies (SAMMS) against mitigating the impact of the development upon the Epping Forest Special Area of Conservation (SAC). Monitoring Fee - A financial Contribution towards the implementation and monitoring of and securing compliance with the s106, equal to 5% of the total of all other financial contributions Legal Fees - Payment of the Council's legal fees for the preparation and completion of the Legal Agreement.

Policies cited
D1
D4
Waltham Forest Local Plan 53
Waltham Forest Local Plan 57
Waltham Forest Local Plan 56
D6
G7
Waltham Forest Local Plan 79
Waltham Forest Local Plan 80
DF1
Waltham Forest Local Plan 3
Waltham Forest Local Plan 46
Waltham Forest Local Plan 66
Waltham Forest Local Plan 85
Waltham Forest Local Plan 87
Waltham Forest Local Plan 94
Parties
Timeline
5 Feb 2026
Application submitted
23 Feb 2026
Application validated
7 May 2026
Delegated decision: Refused
Supporting documents · 41
125 of 41
Planning Decision Notice - General - Refuse (with Informativ16 Apr 2026View ↗
Officer Report14 Apr 2026View ↗
Application-form.pdf24 Feb 2026View ↗
4194-Planning-Design-Access-Statement-Character-Appraisal-co20 Feb 2026View ↗
4194-GA 901 PL 1.pdf6 Feb 2026View ↗
4194-GA 900 PL 1.pdf6 Feb 2026View ↗
4194-GA 525 PL 1.pdf6 Feb 2026View ↗
4194-GA 501 PL 1.pdf6 Feb 2026View ↗
4194-GA 500 PL 1.pdf6 Feb 2026View ↗
4194-GA 410 PL 1.pdf6 Feb 2026View ↗
4194-GA 400 PL 1.pdf6 Feb 2026View ↗
4194-GA 351 PL 1.pdf6 Feb 2026View ↗
4194-GA 350 PL 1.pdf6 Feb 2026View ↗
4194-GA 340 PL 1.pdf6 Feb 2026View ↗
4194-GA 320 PL 1.pdf6 Feb 2026View ↗
4194-GA 314 PL .pdf6 Feb 2026View ↗
4194-GA 313 PL 1.pdf6 Feb 2026View ↗
4194-GA 312 PL 1.pdf6 Feb 2026View ↗
4194-GA 311 PL 1.pdf6 Feb 2026View ↗
4194-GA 310 PL 1.pdf6 Feb 2026View ↗
4194-GA 301 PL 1.pdf6 Feb 2026View ↗
4194-GA 300 PL 1.pdf6 Feb 2026View ↗
4194-GA 051 PL 1.pdf6 Feb 2026View ↗
4194-GA 050 PL 1.pdf6 Feb 2026View ↗
4194-GA 040 PL 1.pdf6 Feb 2026View ↗
View Application Page ↗
Data from the Waltham Forest planning register.
Summary
Reference
260327
Type
Full Planning
Applicant
Haslehurst
Submitted
5 Feb 2026
Decision date
7 May 2026
Decision
Refused
Decision route
Delegated (officer)
How long, really
13
wks · this application
Submission → decision · 5 wks over the 8-week target