Development Intent
AtlasRedbridgeOfficersIda Faal
Case officer · Redbridge Planning

Ida Faal.

Active — last recorded decision Mar 2026

A case officer at Redbridge with an approval rate of 71% across 130 decided planning applications, spanning 17 wards.[1] Decision speed and appeal performance publish when decision notices are ingested.

Planning officer130 decisions71% approvalSave
Redbridge · ward map
Approval rate — by ward
Lower ~68%
Higher ~90%
ShowingAll years · subscriber →across all years on record — a period re-scopes the headline figures and the trend
At a glanceEach metric links to the investigation behind it
All investigations →
130
Applications
2025–26
Approval rate over time — tougher or softer 🔒Dashed line = London average
avg 81%69%202575%2026
Approval-rate trend is subscriber dataSubscribe to see the trend →
What they decide — by application type
How they compareVersus peers
Approval rate71% · 24th of 32
higher is betterdashed = London avg
Decision time · publishes with decision notices
in development
Appeal overturn · publishes with decision notices
in development
How this officer decides — from their own reports112 officer reports parsed
30%
Approves despite concerns
of approvals record a documented reservation
16%
Negotiated approvals
approvals mentioning revisions/amendments
4%
"On balance" reports
reports using explicit balancing language
64%
Bespoke reasoning
of report text written for the case, not recited
What they write about — vs Redbridge's average officer

Topic mentions per 1,000 words of their own report text (boilerplate stripped), indexed against all parsed Redbridge reports. Attention, not stance.

Bulk & massing
2.23× borough avg
Character & heritage
1.67× borough avg
Materials & detailing
1.2× borough avg
Privacy & overlooking
1.16× borough avg
Outlook & amenity
0.95× borough avg

Mark = borough average (1×). Bar capped at 2×.

How they reason — coded from their reports

Faal's refusals turn on a dormer or extension failing to remain subordinate in scale to the host roof/building, and she is explicit about set-in distances (from ridge, eaves, boundary) as the operative measurements determining subordination, comparing them directly against Housing Design SPD or conservation area guide figures. Her approvals lean on named comparator extensions on the same road at a similar depth.

Observable habits

· states the specific set-in distances from ridge, eaves and side boundary and compares them directly against the guide's numeric thresholds to determine subordination

· names comparator properties on the same road with extensions/dormers of similar depth or design to support acceptability

· treats a scheme's failure to be 'subordinate in size and scale' as the specific basis for refusal rather than a general design objection

What their reports consistently look for

· what this officer's reports consistently look for: the specific set-in distances from ridge, eaves and side boundary compared against the guide's numeric thresholds

· what this officer's reports consistently look for: named comparator properties on the same road at a similar extension depth

· what this officer's reports consistently look for: whether a roof extension remains subordinate in scale to the existing roof, stated as the specific ground for acceptance or refusal

Assigned Ida Faal on a live case?What they pay attention to, how they reason, and what their reports consistently look for — so you can address it before they raise it.Subscribe to unlock →
In their own words

The rear dormer extension to the existing dormer at main roof level with minimal set ins would dominate this roof profile. In addition, the rear dormer would cover more than half the length of the ground floor rear extension and the host building

1275/25

there are single storey rear extensions of a similar scale within the surrounding area

1327/25

Measured from 112 published Redbridge officer reports written by this officer, with recited policy boilerplate stripped before any counting. These describe how this officer works and writes — they are not outcome predictions. Every quote is from a named public report.

Policy playbook — what this officer cites[3]

The policies this officer cites most in their own reports — times cited across 112 parsed reports. Whether refusals citing each survive appeal isn't traced per policy yet.

LP26and LP27). This will enable a large
89 times cited
LP30Household Extensions
77 times cited
D3
73 times cited
D12
71 times cited
G6
49 times cited
LP38Protecting Trees and Enhancing the Landscape
49 times cited
LP39Nature Conservation and Biodiversity
47 times cited
G7
42 times cited
Which policies this officer leans on is subscriber intelligenceSubscribe to unlock →
Decisions by ward

Where this officer's caseload concentrates, 2025–26.[1] Click the map above to focus this page on a ward, or a row to open the ward.

Recent applications
Address
Reference
Type
Outcome
Date
0307/26
Householder (fasttrack)
Approved
2026-05-29
0604/26
Householder
Approved
2026-05-26
0307/26
Householder (fasttrack)
Approved
2026-05-29
0604/26
Householder
Approved
2026-05-26
Full application history locked
Subscribe to see all 130 decisions →
Consultants approved most— subscriber data
1. Consulting Ltd
2. Civils Consulting Ltd
3. SMART SKILLS LTD
4. STRAIGHT ARCH LTD.
At a glance
OfficerIda Faal
BoroughRedbridge
RolePlanning officer
Experience
Applications130 (2025–26)
Approval rate71%
London approval avg81%
Who decides here
GovernmentMayor of LondonCouncilCommitteeOfficersDecisionsApplicantsInspectorate
Related investigations
When committees overrule officers like this one →
How often members depart from officer recommendations, and how those overrides fare at appeal.
How much gets decided without a committee →
The delegated share by borough and officer — where the real power over decisions sits.
Sources & method
  1. [1]Applications decided, approval rate, per-year trend and ward breakdown — London Borough of Redbridge planning register and published decision notices, 2025–26. · methodology
  2. [2]Appeal overturn and decision-time benchmarks — Planning Inspectorate (PINS) appeal decisions and application date pairs; not yet computed per officer, shown as a dash until they are. · PINS appeals casework
  3. [3]Condition load — mean effective conditions attached to Redbridge decision notices (grant/split), parsed from the published notice text; a borough figure, not yet split per case officer.
  4. [4]"How this officer decides", the policy playbook and all quotes — parsed from 112 published Redbridge officer reports written by this officer, recited policy boilerplate stripped before counting; disposition text coded from their own reasoning with every quote machine-verified verbatim. Descriptive of how they work — not outcome predictions.
Methodology is published in full so every number is traceable to its primary source.