Development Intent
AtlasRedbridgeOfficersKashi Bhanji
Case officer · Redbridge Planning

Kashi Bhanji.

Active — last recorded decision May 2026

A case officer at Redbridge with an approval rate of 77% across 735 decided planning applications, spanning 21 wards.[1] Decision speed and appeal performance publish when decision notices are ingested.

Planning officer735 decisions77% approvalSave
Redbridge · ward map
Approval rate — by ward
Lower ~68%
Higher ~90%
ShowingAll years · subscriber →across all years on record — a period re-scopes the headline figures and the trend
At a glanceEach metric links to the investigation behind it
All investigations →
735
Applications
2023–26
Approval rate over time — tougher or softer 🔒Dashed line = London average
avg 81%80%202380%202471%202574%2026
Approval-rate trend is subscriber dataSubscribe to see the trend →
What they decide — by application type
How they compareVersus peers
Approval rate77% · 13th of 32
higher is betterdashed = London avg
Decision time · publishes with decision notices
in development
Appeal overturn · publishes with decision notices
in development
How this officer decides — from their own reports324 officer reports parsed
7%
Approves despite concerns
of approvals record a documented reservation
7%
Negotiated approvals
approvals mentioning revisions/amendments
22%
"On balance" reports
reports using explicit balancing language
67%
Bespoke reasoning
of report text written for the case, not recited
What they write about — vs Redbridge's average officer

Topic mentions per 1,000 words of their own report text (boilerplate stripped), indexed against all parsed Redbridge reports. Attention, not stance.

Energy & sustainability
1.51× borough avg
Trees & landscape
1.42× borough avg
Materials & detailing
1.3× borough avg
Privacy & overlooking
1.25× borough avg
Character & heritage
1.24× borough avg

Mark = borough average (1×). Bar capped at 2×.

How they reason — coded from their reports

Bhanji assesses rear extension depth by naming specific neighbouring properties and their existing extension depths as the direct comparator, address by address, before concluding on impact to each in turn. He is explicit about a prior-approval or fall-back structure already under construction on the same site as a reason a further increment is acceptable.

Observable habits

· names each affected neighbouring property by number and states its own existing extension depth as the direct comparator before assessing impact

· treats an existing, already-under-construction prior approval on the same site as contextual justification for accepting further depth

· gives the precise metric excess over the Housing Design SPD guide depth (e.g. 'exceeds the ... Guidance depth by 0.7m') before concluding acceptability

What their reports consistently look for

· what this officer's reports consistently look for: each individually affected neighbour named with its own existing extension depth as the comparator

· what this officer's reports consistently look for: the precise metric by which a scheme exceeds the SPD guide depth

· what this officer's reports consistently look for: whether an existing prior approval or under-construction extension on the same boundary supports accepting further depth

Assigned Kashi Bhanji on a live case?What they pay attention to, how they reason, and what their reports consistently look for — so you can address it before they raise it.Subscribe to unlock →
In their own words

Though the proposal exceeds the Housing Design 2019 SPD Guidance depth by 0.7 m, it is considered that the proposed is modest addition in depth to the existing single storey rear projection and several properties in the area have single storey rear extension of a similar depth, including neighbouring properties at No. 119, 126 and 130

1271/23

No. 119 is situated to the West of the applicant site and benefits from a rear extension 4.20 meters deep therefore the proposed extension would not extend over the shared boundary

1271/23

Measured from 324 published Redbridge officer reports written by this officer, with recited policy boilerplate stripped before any counting. These describe how this officer works and writes — they are not outcome predictions. Every quote is from a named public report.

Policy playbook — what this officer cites[3]

The policies this officer cites most in their own reports — times cited across 324 parsed reports. Whether refusals citing each survive appeal isn't traced per policy yet.

LP26and LP27). This will enable a large
236 times cited
D3
231 times cited
D12
230 times cited
LP30Household Extensions
168 times cited
G6
161 times cited
LP38Protecting Trees and Enhancing the Landscape
88 times cited
LP23Cycle and Car Parking Standards
73 times cited
T6.1
60 times cited
Which policies this officer leans on is subscriber intelligenceSubscribe to unlock →
Decisions by ward

Where this officer's caseload concentrates, 2023–26.[1] Click the map above to focus this page on a ward, or a row to open the ward.

Recent applications
Address
Reference
Type
Outcome
Date
2866/25
Full Planning Permission
Approved
2026-05-27
2866/25
Full Planning Permission
Approved
2026-05-27
Full application history locked
Subscribe to see all 735 decisions →
Consultants approved most— subscriber data
1. Consulting Ltd
2. SMART SKILLS LTD
3. DESIGN
4. Homestead - TP&BRC
At a glance
OfficerKashi Bhanji
BoroughRedbridge
RolePlanning officer
Experience
Applications735 (2023–26)
Approval rate77%
London approval avg81%
Who decides here
GovernmentMayor of LondonCouncilCommitteeOfficersDecisionsApplicantsInspectorate
Related investigations
When committees overrule officers like this one →
How often members depart from officer recommendations, and how those overrides fare at appeal.
How much gets decided without a committee →
The delegated share by borough and officer — where the real power over decisions sits.
Sources & method
  1. [1]Applications decided, approval rate, per-year trend and ward breakdown — London Borough of Redbridge planning register and published decision notices, 2023–26. · methodology
  2. [2]Appeal overturn and decision-time benchmarks — Planning Inspectorate (PINS) appeal decisions and application date pairs; not yet computed per officer, shown as a dash until they are. · PINS appeals casework
  3. [3]Condition load — mean effective conditions attached to Redbridge decision notices (grant/split), parsed from the published notice text; a borough figure, not yet split per case officer.
  4. [4]"How this officer decides", the policy playbook and all quotes — parsed from 324 published Redbridge officer reports written by this officer, recited policy boilerplate stripped before counting; disposition text coded from their own reasoning with every quote machine-verified verbatim. Descriptive of how they work — not outcome predictions.
Methodology is published in full so every number is traceable to its primary source.