Planning Application
2025/03380/FUL
20 Lower Mall London W6 9DJ
Full / Other PlanningHammersmith Broadway ward
Submission
5 Dec 2025
Target
—
Decision
20 Mar 2026
Outcome
Approved
Delegated decisionApproved
20 Mar 2026Decided by Megan Smith under delegated powers
Loading map…
Scheme description
Erection of an additional floor at roof level; erection of rear extensions at ground, first and second floor levels; replacement of existing metal railings to existing roof terrace with new glass balustrades at second floor level.
Parties
Timeline
5 Dec 2025
Application submitted
8 Dec 2025
Application validated
20 Mar 2026
Delegated decision: Approved
Supporting documents · 27
1–25 of 27
APPLICATIONFORMREDACTEDView ↗
1130-001-LOCATION-PLANView ↗
1130-002-BLOCK-PLAN-AS-EXISTINGView ↗
1130-010-GROUND-FLOOR-PLAN-AS-EXISTINGView ↗
1130-011-FIRST-FLOOR-PLAN-AS-EXISTINGView ↗
1130-012-ROOF-PLAN-AS-EXISTINGView ↗
1130-020-FRONT-AND-SIDE-ELEVATIONS-AS-EXISTINGView ↗
ELEVATION-(SIDE)---EXISTING_INCLUDED_IN_ELEVATION-(FRONT)---View ↗
1130-021-REAR-AND-SIDE-ELEVATIONS-AS-EXISTINGView ↗
ELEVATION-(SIDE)---EXISTING_INCLUDED_IN_ELEVATION-(REAR)---EView ↗
1130-022-SECTION-AA-AND-BB-AS-EXISTINGView ↗
1130-P003-BLOCK-PLAN-AS-PROPOSEDView ↗
1130-P110A-GROUND-FLOOR-PLAN-AS-PROPOSEDView ↗
1130-P111-FIRST-FLOOR-PLAN-AS-PROPOSEDView ↗
1130-P112-SECOND-FLOOR-PLAN-AS-PROPOSEDView ↗
1130-P113-ROOF-PLAN-AS-PROPOSEDView ↗
1130-P120--FRONT-AND-SIDE-ELEVATION-AS-PROPOSEDView ↗
ELEVATION-(SIDE)---PROPOSED_INCLUDED_IN_ELEVATION-(FRONT)---View ↗
1130-P121--REAR-ELEVATION-AS-PROPOSEDView ↗
1130-P122-SECTIONS-AA-AND-BB-AS-PROPOSEDView ↗
1130-DASView ↗
1130-FIRE-STATEMENTView ↗
OLD-WHARF-HOUSE-FRAView ↗
1130---CIL-FORMView ↗
OFFICER-S-FILE-NOTEView ↗
View Application Page ↗
Data from the Hammersmith And Fulham planning register.
Summary
Reference
2025/03380/FUL
Type
Full Planning Application
Applicant
Mr D Tulk
Submitted
5 Dec 2025
Decision date
20 Mar 2026
Officer
Council
Decision
Approved
Decision route
—
How long, really
15
wks · this application
Submission → decision · 7 wks over the 8-week target