Development Intent
Planning AtlasHammersmith And FulhamWendell ParkApplication
Planning Application

2025/02462/FUL

285 Uxbridge Road London W12 9DT

Full / Other PlanningWendell Park ward
Submission
11 Sep 2025
Target
13 Jan 2029
Decision
13 Jan 2026
Outcome
Approved
Delegated decisionApproved
13 Jan 2026
Decided by Megan Smith under delegated powers
Loading map…
Scheme description

Replacement of existing single-glazed timber sash and casement windows and existing rear timber door with heritage style double-glazed timber sash windows to the front elevation and double-glazed uPVC windows and door to the rear elevations, matching the existing size, style, and profile.

Parties
Timeline
11 Sep 2025
Application submitted
12 Sep 2025
Application validated
13 Jan 2026
Delegated decision: Approved
Supporting documents · 22
APPLICATIONFORMREDACTEDView ↗
285-UXBRIDGE-ROAD---PHOTOSView ↗
285-UXBIRDGE-ROAD---DESIGN-AND-ACCESS-STATEMENTView ↗
CASEMENTView ↗
SASH-CORDS-24MMView ↗
SASH-SPRINGS-24MMView ↗
SINGLE-INWARD-DOORView ↗
25-3918-UR-BL-001-BLOCK-PLANView ↗
LAYOUT-PLAN---PROPOSED_INCLUDED_IN_LAYOUT-PLAN---EXISTINGView ↗
SITEBLOCK-PLAN---EXISTING_INCLUDED_IN_LAYOUT-PLAN---EXISTINGView ↗
25-3918-UR-LP-002-LOCATION-PLANView ↗
25-3918-285UR-EL-008---285-UXBRIDGE-ROAD-PROPOSED-SIDE-ELEVAView ↗
25-3918-285UR-EL-003---285-UXBRIDGE-ROAD-EXISTING-FRONT-ELEVView ↗
25-3918-285UR-EL-004---285-UXBRIDGE-ROAD-EXISTING-REAR-ELEVAView ↗
25-3918-285UR-EL-005---285-UXBRIDGE-ROAD-EXISTING-FLANK-ELEVView ↗
25-3918-285UR-EL-006---285-UXBRIDGE-ROAD-PROPOSED-FRONT-ELEVView ↗
25-3918-285UR-EL-007---285-UXBRIDGE-ROAD-PROPOSED-REAR-ELEVAView ↗
FORM_1_CIL_ADDITIONAL_INFORMATIONView ↗
REHAU-DRAWINGSView ↗
TW6---SLIDING-SASH-WINDOWView ↗
PER.FULL-PLANNING-PERMISSIONView ↗
DELEGATED-REPORT-TEMPLATE---LIVEView ↗
View Application Page ↗
Data from the Hammersmith And Fulham planning register.
Summary
Reference
2025/02462/FUL
Type
Full Planning Application
Applicant
Notting Hill Genesis
Submitted
11 Sep 2025
Decision date
13 Jan 2026
Decision
Approved
Decision route
How long, really
18
wks · this application
Submission → decision · 10 wks over the 8-week target