Planning Application
2023/01179/FUL
Flat B First And Second Floors 41 Ongar Road London SW6 1SL
Full / Other PlanningLillie ward
Submission
5 May 2023
Target
1 Sep 2026
Decision
1 Sep 2023
Outcome
Approved
Delegated decisionApproved
1 Sep 2023Decided by Hasna Miah under delegated powers
Loading map…
Scheme description
Erection of an additional floor at roof level (with 5no. solar pv panels on top of the main flat roof and 2no. solar pv panels in the front roofslope), including the formation of a roof terrace to the front elevation; erection of a rear extension at third floor level, on top of the existing back addition.
Parties
Timeline
5 May 2023
Application submitted
9 May 2023
Application validated
1 Sep 2023
Delegated decision: Approved
Supporting documents · 27
1–25 of 27
EXISTING-FLOOR-PLANS-1883-03View ↗
EXISTING-SECTION-1883-04View ↗
EXISTING-FRONT-AND-REAR-ELEVATION-1883-05View ↗
1883-01-SITE-LOCATION-PLANView ↗
EXISTING-GROUND-FLOOR-PLAN-1883-06View ↗
SUPERSEDED-1883-07View ↗
SUPERSEDED-1883-08View ↗
SUPERSEDED-1883-09View ↗
PROPOSED-ROOF-PLAN-1883-10View ↗
SUPERSEDED-1883-11View ↗
SUPERSEDED-1883-12View ↗
ELEVATION-(REAR)---EXISTING_INCLUDED_IN_ELEVATION-(FRONT)---View ↗
ELEVATION-(REAR)---PROPOSED_INCLUDED_IN_ELEVATION-(FRONT)---View ↗
FLOOD-MAP-PLANNING-2023-05-05T06_04_27.969ZView ↗
FORM_1_CIL_ADDITIONAL_INFORMATIONView ↗
SITEBLOCK-PLAN---EXISTING_INCLUDED_IN_BLOCK-PLAN-OF-THE-SITEView ↗
1883-02View ↗
1883---DASView ↗
LAYOUT-PLAN---PROPOSED_INCLUDED_IN_LAYOUT-PLAN---EXISTINGView ↗
THE-LOCATION-PLAN_INCLUDED_IN_BLOCK-PLAN-OF-THE-SITEView ↗
REVISED-PROPOSED-FIRST-FLOOR-PLANView ↗
REVISED-PROPOSED-FRONT-AND-REAR-ELEVATIONSView ↗
REVISED-PROPOSED-SECOND-PLANView ↗
REVISED-PROPOSED-SECTIONView ↗
REVISED-PROPOSED-THIRD-FLOOR-PLANView ↗
View Application Page ↗
Data from the Hammersmith And Fulham planning register.
Summary
Reference
2023/01179/FUL
Ward
Type
Full Planning Application
Applicant
Ms Veronika Oswald
Submitted
5 May 2023
Decision date
1 Sep 2023
Officer
Council
Decision
Approved
Decision route
—
How long, really
17
wks · this application
Submission → decision · 9 wks over the 8-week target