Planning Application
2022/02465/FUL
17 Bettridge Road London SW6 3QH
Full / Other PlanningPalace And Hurlingham ward
Submission
27 Aug 2022
Target
20 Dec 2025
Decision
20 Dec 2022
Outcome
Approved
Delegated decisionApproved
20 Dec 2022Decided by Mwansa Tembo under delegated powers
Loading map…
Scheme description
Erection of a single storey extension to the side and rear of the back addition; excavation of the front and part of the rear garden to form lightwells, in connection with the enlargement and lowering of the existing basement; reconstruction of the front boundary wall by reducing the width. (Revised description and drawings).
Parties
Applicant
Anton MorozovOfficer
Mwansa TemboTimeline
27 Aug 2022
Application submitted
2 Sep 2022
Application validated
20 Dec 2022
Delegated decision: Approved
Supporting documents · 20
7378---17-BETTRIDGE-ROAD-PROPOSED-DRAWINGS---REV.FView ↗
CONSTRUCTION-METHOD-STATEMENT-INCLUDING-FLOOD-RISK-ASSESSMENView ↗
7378---17-BETTRIDGE-ROAD-FIRE-SAFETY-STATEMENT---REV.FView ↗
7378---17-BETTRIDGE-ROAD-DAS---REV.FView ↗
7378---17-BETTRIDGE-ROAD-EXISTING-DRAWINGS---REV.FView ↗
7378---17-BETTRIDGE-ROAD-OS-LOCATION---REV.FView ↗
EXTRA-PHOTOSView ↗
PROPOSED-DRAWINGView ↗
PROPOSED-ELEVATIONS-7378---REV-O---BIG-BS-EXTENSION-2View ↗
PROPOSED-FIRST-FLOOR-PLAN-7378---REV-O---BIG-BS-EXTENSION-2View ↗
PROPOSED-SITE-PLAN-7378---17-REV-O---BIG-BS-EXTENSION-2View ↗
PROPOSED-BASEMENT-PLAN-7378---REV-O---BIG-BS-EXTENSION-2View ↗
PROPOSED-SECTION-AA-CC-7378---REV-O---BIG-BS-EXTENSION-2View ↗
PROPOSED-LOFT-PLAN-7378---REV-O---BIG-BS-EXTENSION-2View ↗
PROPOSED-ROOF-PLAN-7378---REV-O---BIG-BS-EXTENSION-2View ↗
PROPOSED-SECTIONS-BB-DD-7378---REV-O---BIG-BS-EXTENSION-2View ↗
PROPOSED-GROUND-FLOOR-PLAN-7378---REV-O---BIG-BS-EXTENSION-2View ↗
FLOOD-RISK-ASSESMENTView ↗
PER.FULL-PLANNING-PERMISSIONView ↗
DELEGATED-REPORT-TEMPLATE---LIVEView ↗
View Application Page ↗
Data from the Hammersmith And Fulham planning register.
Summary
Reference
2022/02465/FUL
Type
Full Planning Application
Applicant
Anton Morozov
Submitted
27 Aug 2022
Decision date
20 Dec 2022
Officer
Council
Decision
Approved
Decision route
—
How long, really
16
wks · this application
Submission → decision · 8 wks over the 8-week target