Planning Application
2022/02051/FUL
20 Caxton Road London W12 8AJ
Full / Other PlanningShepherd's Bush Green ward
Submission
19 Jul 2022
Target
21 Mar 2026
Decision
21 Mar 2023
Outcome
Approved
Delegated decisionApproved
21 Mar 2023Decided by Paul Curtis under delegated powers
Loading map…
Scheme description
Erection of a rear roof extension; erection of a rear extension at second floor level, over part of the existing back addition; installation of 2no. rooflights in the front roofslope; installation of French doors and a Juliette balcony, to the rear elevation at first floor level following the removal of existing window; erection of a new low level brick built front boundary wall with metal railings on top, including brick columns and installation of a new metal front entrance gate.
Parties
Timeline
19 Jul 2022
Application submitted
20 Jul 2022
Application validated
21 Mar 2023
Delegated decision: Approved
Supporting documents · 21
PP-11-3528-20-CAX--EXISTING-AND-PROPOSED-SIDE-ELEVATIONSView ↗
PP-12-3528-20-CAX--EXISTING-AND-PROPOSED-SITE-PLANSView ↗
PP-04-3528-20-CAX-EXISTING-ROOF-TOP-PLANView ↗
BLOCK-PLANView ↗
LOCATION-PLANView ↗
PP-01-3528-20-CAX-EXISTING-GROUND-FLOOR-PLANView ↗
FRAView ↗
PP-07-3528-20-CAX-PROPOSED-FIRST-FLOOR-PLANView ↗
CIL_FORMView ↗
DESIGN-AND-ACCESS-STATEMENTView ↗
PP-02-3528-20-CAX-EXISTING-FIRST-FLOOR-PLANView ↗
PP-10-3528-20-CAX-PROPOSED-SECTIONS-AND-ELEVATIONSView ↗
PP-03-3528-20-CAX-EXISTING-LOFT-FLOOR-PLANView ↗
PP-05-3528-20-CAX-EXISTING-SECTIONS-AND-ELEVATIONSView ↗
PP-09-3528-20-CAX-PROPOSED-ROOF-TOP-PLANView ↗
PP-06-3528-20-CAX-PROPOSED-GROUND-FLOOR-PLANView ↗
PP-08-3528-20-CAX-PROPOSED-LOFT-FLOOR-PLANView ↗
FRENCH-DOORS-BROCHUREView ↗
PROPOSED-SECTIONS-AND-ELEVATIONSView ↗
PER.FULL-PLANNING-PERMISSIONView ↗
PER.FULL-PLANNING-PERMISSIONView ↗
View Application Page ↗
Data from the Hammersmith And Fulham planning register.
Summary
Reference
2022/02051/FUL
Type
Full Planning Application
Applicant
Jane Cronin
Submitted
19 Jul 2022
Decision date
21 Mar 2023
Officer
Council
Decision
Approved
Decision route
—
How long, really
35
wks · this application
Submission → decision · 27 wks over the 8-week target