Planning Application
2022/01882/FUL
3 Beaconsfield Terrace Road London W14 0PP
Full / Other PlanningBrook Green ward
Submission
30 Jun 2022
Target
8 May 2027
Decision
13 Jun 2024
Outcome
Approved
Delegated decisionApproved
13 Jun 2024Decided by Paul Curtis under delegated powers
Loading map…
Scheme description
Change of use of the basement and ground floor level from retail (Class E) into 2 x 1 bedroom self-contained flats (Class C3); replacement of existing shopfront with new doors and windows; alterations to the front lightwell and pavement light in connection with the formation of utility room and refuse storage at basement level; part opening up of the existing central vault to form a bike store at basement level; demolition of the roof and part of the back wall to the rear office room at ground floor level to form an open patio space, and installation of new doors and window openings at basement and ground floor level to the rear elevation; erection of an external staircase from basement to g
Parties
Timeline
30 Jun 2022
Application submitted
6 Jul 2022
Application validated
13 Jun 2024
Delegated decision: Approved
Supporting documents · 20
PROPOSED-GF-PLANView ↗
3-BEACONSFIELD-TERR.-RD.-A3-DWGS-REV-CView ↗
DASView ↗
THELOCATIONPLAN_INCLUDED_IN_ADDITIONALPLANSView ↗
CIL-QUESTIONSView ↗
SUPPORTING-STATEMENT-3-BEACONSFIELD-TERRACE-ROADView ↗
FLOOD-RISK-ASSESSMENT-SUMMARY-3-BEACONSFIELD-TERR.-RD-REV-AView ↗
BEACONSFIELD-TERRACE_DAYLIGHT-ASSESSMENTView ↗
163.04-PROPOSED-BASEMENT-PLAN-REV-CView ↗
OFFICERS-FILE-NOTEView ↗
REVISED-FRAView ↗
PROPOSED-FRONT-ELEVATION-View ↗
FRONT-ELEVATIONView ↗
PROPOSED-BASEMENT-PLANView ↗
EXISTING-GF-PLANView ↗
EXISTING-GF-PLANView ↗
PROPOSED-BASEMENT-PLANView ↗
REVISED-DAYLIGHT-ASSESSMENTView ↗
DELEGATED-OFFICER-REPORTView ↗
DECISION-NOTICEView ↗
View Application Page ↗
Data from the Hammersmith And Fulham planning register.
Summary
Reference
2022/01882/FUL
Ward
Type
Full Planning Application
Applicant
Mr A Fowler
Submitted
30 Jun 2022
Decision date
13 Jun 2024
Officer
Council
Decision
Approved
Decision route
—
How long, really
102
wks · this application
Submission → decision · 94 wks over the 8-week target