26/0671/F
ELTHAM GPO, 4 PASSEY PLACE, LONDON, SE9 5DQ
Construction of two-storey upward extension to facilitate the creation of seven (7) residential units (Use Class C3) together with internal cycle parking, refuse and recycling storage.
By reason of the insufficient outlook, light and privacy provided for Flat 5, the insufficient outlook and light provided for Flat 3 and the insufficient outlook and light provided for Flat 2, the proposed development would fail to provide a suitable quality of accommodation for all future occupiers. Consequently, the proposed development would not be compliant with Policy D6 of the London Plan (2021), Policies H5 and DH1 of the Royal Greenwich Local Plan: Core Strategy with Detailed Policies (2014) and the Technical Housing Standards – Nationally Described Space Standard (2015), the London Housing SPG (2016).
The application submission fails to include section drawings going through the proposed development and the developments approved at nos. 2 and 4 Chequers Parade nor a Daylight/Sunlight Assessment on the light received by the approved front facing habitable room windows of these developments. Due to this insufficient information, officers raise concern on the impact that the development would have on the outlook, daylight and privacy afforded to the future occupiers of these units. As such, the development is not considered to be in accordance with Policy D3 of the London Plan (2021) and Policy DH(b) of the Royal Greenwich Local Plan: Core Strategy with Detailed Policies (2014) and the Urban Design SPD (2023).
The application submission fails to include section drawings going through the proposed development and the developments approved at no. 106 Eltham High Street nor a Daylight/Sunlight Assessment on the light received by the rear facing habitable room window and decking area of this development. Due to this insufficient information, officers raise concern on the impact that the development would have on the outlook and daylight afforded to the future occupiers of these units. As such, the development is not considered to be in accordance with Policy D3 of the London Plan (2021) and Policy DH(b) of the Royal Greenwich Local Plan: Core Strategy with Detailed Policies (2014) and the Urban Design SPD (2023).