Development Intent
AtlasCroydonOfficersJustin Reid Weekes
Case officer · Croydon Planning

Justin Reid-Weekes.

Last recorded decision Oct 2021 — no decisions in this record since

A case officer at Croydon with an approval rate of 79% across 39 decided planning applications, spanning 15 wards.[1] Decision speed and appeal performance publish when decision notices are ingested.

Planning officer39 decisions79% approvalSave
Croydon · ward map
Approval rate — by ward
Lower ~68%
Higher ~90%
ShowingAll years · subscriber →across all years on record — a period re-scopes the headline figures and the trend
At a glanceEach metric links to the investigation behind it
All investigations →
39
Applications
2020–21
Approval rate over time — tougher or softer 🔒Dashed line = London average
avg 81%84%202133%2022
Approval-rate trend is subscriber dataSubscribe to see the trend →
What they decide — by application type
How they compareVersus peers
Approval rate79% · 21st of 83
higher is betterdashed = London avg
Decision time · publishes with decision notices
in development
Appeal overturn · publishes with decision notices
in development
How this officer decides — from their own reports50 officer reports parsed
8%
Approves despite concerns
of approvals record a documented reservation
0%
Negotiated approvals
approvals mentioning revisions/amendments
2%
"On balance" reports
reports using explicit balancing language
76%
Bespoke reasoning
of report text written for the case, not recited
What they write about — vs Croydon's average officer

Topic mentions per 1,000 words of their own report text (boilerplate stripped), indexed against all parsed Croydon reports. Attention, not stance.

Trees & landscape
1.66× borough avg
Transport & parking
1.57× borough avg
Daylight & sunlight
1.35× borough avg
Outlook & amenity
1.16× borough avg
Privacy & overlooking
0.92× borough avg

Mark = borough average (1×). Bar capped at 2×.

How they reason — coded from their reports

Reid-Weekes handles a caseload weighted towards larger flatted schemes and telecoms masts, and he is precise on vehicle-access gradient standards, citing the exact SPD2 1:12 maximum gradient and 5x5m level-standing-area requirement against what a scheme actually achieves in metres. On telecoms masts he consistently benchmarks a proposed structure's height against nearby existing street furniture in exact metres (e.g. '5m higher than nearby existing streetlights') to ground a visual-intrusion finding in something measurable rather than a subjective impression, and is candid about listing every condition that would have applied to an otherwise-refused scheme.

Observable habits

· cites the exact SPD2 numeric gradient standard (1:12 maximum, 5x5m level standing area) against what a scheme's access ramp/driveway actually achieves in metres, rather than a general 'too steep' judgement

· benchmarks a proposed telecoms mast's height in exact metres against nearby existing street furniture (streetlights, other structures) to ground a visual-intrusion finding in a measurable comparison

· lists the specific conditions that would have applied (EVCP, boundary treatment, landscaping, S106 contribution) even within a refusal report, similar to the practice also seen in James Young's corpus

What their reports consistently look for

· the exact gradient (e.g. 1:6 vs the 1:12 maximum) and level-standing-area dimensions a vehicle access achieves against SPD2's numeric standard

· a telecoms mast's height benchmarked in metres against nearby existing street furniture, not a subjective 'prominent' judgement

· whether cycle storage is genuinely accessible to a disabled resident with an adapted bike, not just numerically sufficient

Assigned Justin Reid-Weekes on a live case?What they pay attention to, how they reason, and what their reports consistently look for — so you can address it before they raise it.Subscribe to unlock →
In their own words

The gradient of the slope would be 1:6 throughout which would be unacceptable as it would be too steep. The scheme would require a minimum 5x5m level standing area adjacent to the public highway whose maximum gradient is 1:12

21/02420/FUL

The proposed monopole at 18m high is 5m higher than nearby existing streetlights, and would be significantly taller than surrounding buildings and structures

21/02945/PA8

Measured from 50 published Croydon officer reports written by this officer, with recited policy boilerplate stripped before any counting. These describe how this officer works and writes — they are not outcome predictions. Every quote is from a named public report.

Policy playbook — what this officer cites[3]

The policies this officer cites most in their own reports — times cited across 50 parsed reports. Whether refusals citing each survive appeal isn't traced per policy yet.

DM29Promoting sustainable travel and reducing congestion
14 times cited
T4
9 times cited
D3
8 times cited
SP4.7
7 times cited
DM30Car and cycle parking in development
5 times cited
SP2Homes
4 times cited
DM10Design and character
3 times cited
D4
3 times cited
Which policies this officer leans on is subscriber intelligenceSubscribe to unlock →
Decisions by ward
Recent applications
Address
Reference
Type
Outcome
Date
21/02321/FUL
Full planning permission
Refused
2022-02-16
21/04117/FUL
Full planning permission
Refused
2022-01-05
21/02321/FUL
Full planning permission
Refused
2022-02-16
21/04117/FUL
Full planning permission
Refused
2022-01-05
Full application history locked
Subscribe to see all 39 decisions →
Consultants approved most— subscriber data
1. PLANS INK LTD
2. Savills
3. CANOPY PLANNING SERVICES LTD
4. Jameson Architectural Surveyors
At a glance
OfficerJustin Reid-Weekes
BoroughCroydon
RolePlanning officer
Experience
Applications39 (2020–21)
Approval rate79%
London approval avg81%
Who decides here
GovernmentMayor of LondonCouncilCommitteeOfficersDecisionsApplicantsInspectorate
Related investigations
When committees overrule officers like this one →
How often members depart from officer recommendations, and how those overrides fare at appeal.
How much gets decided without a committee →
The delegated share by borough and officer — where the real power over decisions sits.
Sources & method
  1. [1]Applications decided, approval rate, per-year trend and ward breakdown — London Borough of Croydon planning register and published decision notices, 2020–21. · methodology
  2. [2]Appeal overturn and decision-time benchmarks — Planning Inspectorate (PINS) appeal decisions and application date pairs; not yet computed per officer, shown as a dash until they are. · PINS appeals casework
  3. [3]Condition load — mean effective conditions attached to Croydon decision notices (grant/split), parsed from the published notice text; a borough figure, not yet split per case officer.
  4. [4]"How this officer decides", the policy playbook and all quotes — parsed from 50 published Croydon officer reports written by this officer, recited policy boilerplate stripped before counting; disposition text coded from their own reasoning with every quote machine-verified verbatim. Descriptive of how they work — not outcome predictions.
Methodology is published in full so every number is traceable to its primary source.