26/03250/LBC
The National Gallery Trafalgar Square London WC2N 5DN
Refurbishment works to the Galleries 30 and 31 in the Wilkins Building of the National Gallery including removal of the existing floor grilles and replacement with new cast-iron grilles flush to the adjacent floors, to match adjacent gallery spaces, removal of the existing modern timber floor in Gallery 30 and replacement in new timber boards to match adjacent galleries, refurbishment of remaining floor finishes and stone skirtings, renewal of fabric wall coverings, redecoration of the plaster cornice and coving based on the original design, introduction of extract ventilation at high level within the clerestory, requiring adjustment of modern glazing, introduction of new plant in the roofto