Planning Application
25/04793/FULL
16 - 16A Churton Street London SW1V 2LL
Full / Other PlanningPimlico North ward
Submission
11 Jul 2025
Target
24 Sep 2025
Decision
24 Sep 2025
Outcome
Withdrawn
Delegated decisionWithdrawn
24 Sep 2025Decided by Tristan Goldsmid under delegated powers
Loading map…
Scheme description
Erection of a mansard roof extension; replacement timber sash windows to the front elevation; alterations to shopfront including new timber door with glazed fanlight at ground floor level.
Parties
Timeline
11 Jul 2025
Application submitted
30 Jul 2025
Application validated
24 Sep 2025
Delegated decision: Withdrawn
Supporting documents · 30
1–25 of 30
NEIGHBOUR NOTIFICATION LETTER (21D)1 Sep 2025View ↗
PUBLIC COMMENT11 Aug 2025View ↗
LOCAL FLOOD AUTHORITY RESPONSE8 Aug 2025View ↗
ACK-GENERAL LETTER (G/P/C)5 Aug 2025View ↗
CNSLT-LA SOCIETY5 Aug 2025View ↗
CNSLT-LA SOCIETY5 Aug 2025View ↗
CNSLT-LA SOCIETY5 Aug 2025View ↗
ECNSLT-INTERNAL CONSULTS5 Aug 2025View ↗
SITE NOTICE 21 OR 28 DAYS IF T&C APPL.5 Aug 2025View ↗
SUSTAINABLE DESIGN AND CONSTRUCTION STATEMENT30 Jul 2025View ↗
ELEVATION SECTION30 Jul 2025View ↗
ELEVATION SECTION30 Jul 2025View ↗
1ST INVALID LETTER22 Jul 2025View ↗
APPLICATIONFORMREDACTED11 Jul 2025View ↗
LOCATION PLAN11 Jul 2025View ↗
SITELOCATION11 Jul 2025View ↗
COVERING LETTER11 Jul 2025View ↗
EXISTING BASEMENT AND GROUND FLOOR PLAN11 Jul 2025View ↗
EXISTING FIRST, SECOND AND LOFT PLANS11 Jul 2025View ↗
EXISTING ROOF PLAN11 Jul 2025View ↗
EXISTING LOFT SECTION11 Jul 2025View ↗
EXISTING ELEVATIONS11 Jul 2025View ↗
PROPOSED BASEMENT AND GROUND FLOOR PLANS11 Jul 2025View ↗
PROPOSED FIRST, SECOND, LOFT FLOOR PLANS11 Jul 2025View ↗
PROPOSED ROOF PLAN11 Jul 2025View ↗
View Application Page ↗
Data from the Westminster planning register.
Summary
Reference
25/04793/FULL
Ward
Type
Full Planning Permission Application
Applicant
Chesterman Holdings Ltd
Submitted
11 Jul 2025
Decision date
24 Sep 2025
Officer
Council
Decision
Withdrawn
Decision route
Delegated (officer)
How long, really
11
wks · this application
Submission → decision · 3 wks over the 8-week target
Public response
Objections
0
In support
0
Total comments
1