Planning Application
24/07149/LBC
38 Grosvenor Gardens London SW1W 0EB
Listed BuildingKnightsbridge & Belgravia ward
Submission
11 Oct 2024
Target
23 Jan 2025
Decision
25 Feb 2025
Outcome
Approved
Delegated decisionApproved
25 Feb 2025Decided by Sebastian Knox under delegated powers
Loading map…
Scheme description
External works including replacement of existing slates to roofs to both nos. 36 and 38, new flashing to parapet above existing terracotta friezes, replacement to existing terracotta brackets, replacement of existing fifth floor non-original single glazed pivot windows with new slimline double glazed windows, replacement of existing rear second floor window with a new timber frame casement window, modification to non-original rear metal staircase to allow for a new bike channel installation. Internal alterations including new doorway at lower ground floor level between vaults to No. 38 and adjustments to doorway at fourth floor level. [Site includes 36 Grosvenor Gardens].
Parties
Timeline
11 Oct 2024
Application submitted
28 Nov 2024
Application validated
25 Feb 2025
Delegated decision: Approved
Supporting documents · 39
1–25 of 39
GRANT OF LISTED BUILDING CONSENT [PE]25 Feb 2025View ↗
DELEGATED REPORT25 Feb 2025View ↗
LION CORBEL DETAIL DRAWING14 Feb 2025View ↗
TERRACOTTA BRACKETS MANUFACTURING METHOD STATEMENT14 Feb 2025View ↗
ACK-GENERAL LETTER (G/P/C)5 Dec 2024View ↗
FLOOD RISK ASSESSMENT28 Nov 2024View ↗
CONSORT BRACKET FIXING METHOD STATEMENT12 Nov 2024View ↗
ROOF TYPICAL DETAILS - SHEET 512 Nov 2024View ↗
METHOD STATEMENT TERRACOTTA MASONRY REPAIRS - BRICK/STONE/RE12 Nov 2024View ↗
RECEIPT OF APPLICATION16 Oct 2024View ↗
1ST INVALID LETTER16 Oct 2024View ↗
APPLICATIONFORMREDACTED11 Oct 2024View ↗
HERITAGE STATEMENT11 Oct 2024View ↗
LOCATION PLAN11 Oct 2024View ↗
SITE PLAN11 Oct 2024View ↗
EXISTING ROOF CONDITION REPORT11 Oct 2024View ↗
COVER LETTER11 Oct 2024View ↗
DOUBLE GLAZING FILE NOTE11 Oct 2024View ↗
DRAWING REGISTER11 Oct 2024View ↗
ROOF TYPICAL DETAILS - SHEET 511 Oct 2024View ↗
DEMOLITIONS SECOND FLOOR PLAN11 Oct 2024View ↗
DEMOLITIONS FOURTH FLOOR PLAN11 Oct 2024View ↗
DEMOLITIONS ROOF PLAN11 Oct 2024View ↗
DEMOLITIONS LOWER GROUND FLOOR PLAN11 Oct 2024View ↗
DEMOLITIONS FIFTH FLOOR PLAN11 Oct 2024View ↗
View Application Page ↗
Data from the Westminster planning register.
Summary
Reference
24/07149/LBC
Type
Listed Building Consent Application
Applicant
Reply Ltd.
Submitted
11 Oct 2024
Decision date
25 Feb 2025
Officer
Council
Decision
Approved
Decision route
Delegated (officer)
How long, really
20
wks · this application
Submission → decision · 12 wks over the 8-week target
Public response
Objections
0
In support
0
Total comments
0