Planning Application
20/07867/FULL
33 Molyneux Street London W1H 5HW
Full / Other PlanningBryanston And Dorset Square ward
Submission
9 Dec 2020
Target
3 Feb 2021
Decision
15 Jun 2021
Outcome
Refused
Delegated decisionRefused
15 Jun 2021Decided by Matthew Giles under delegated powers
Loading map…
Scheme description
Excavation of the lower ground floor level by up to 1.5m including front lightwell and vaults and underpinning of party walls. Creation of link between main property and the front pavement vaults and alterations to the vaults, erection of a single storey extension at rear lower ground floor level all for use in association with the existing dwelling house (Use Class C3). Alterations to the front and rear elevations and the insertion of rooflights and an air conditioning unit at main roof level. Internal alterations throughout the property including the creation of a new bathroom over the stair at second floor level and the installation of secondary glazing.
Parties
Applicant
Mr Rob CottonOfficer
Matthew GilesTimeline
9 Dec 2020
Application submitted
15 Jun 2021
Delegated decision: Refused
Supporting documents · 81
1–25 of 81
REFUSAL-FULL PP [PE]15 Jun 2021View ↗
DELEGATED REPORT15 Jun 2021View ↗
J T19 Apr 2021View ↗
ACK-GENERAL LETTER (G/P/C)9 Apr 2021View ↗
CNSLT-LA SOCIETY9 Apr 2021View ↗
CNSLT-LA SOCIETY9 Apr 2021View ↗
ECNSLT-INTERNAL CONSULTS9 Apr 2021View ↗
ECNSLT-INTERNAL CONSULTS9 Apr 2021View ↗
ECNSLT-INTERNAL CONSULTS9 Apr 2021View ↗
SITE NOTICE 21 OR 28 DAYS IF T&C APPL.9 Apr 2021View ↗
NEIGHBOUR NOTIFICATION LETTER (21D)9 Apr 2021View ↗
PROPOSED SECTIONS BASEMENT DETAILS D E F8 Apr 2021View ↗
PROPOSED SECOND FLOOR8 Apr 2021View ↗
PROPOSED ROOF PLAN8 Apr 2021View ↗
PROPOSED GROUND FLOOR8 Apr 2021View ↗
PROPOSED FIRST FLOOR PLAN8 Apr 2021View ↗
PROPOSED BASEMENT8 Apr 2021View ↗
PROPOSED BASEMENT8 Apr 2021View ↗
CMS SEQUENCE LAYOUT8 Apr 2021View ↗
_ISSUE SHEET8 Apr 2021View ↗
GEOLOGICAL SURVEY8 Apr 2021View ↗
BASEMENT CMS_8 Apr 2021View ↗
1ST INVALID LETTER25 Mar 2021View ↗
2ND INVALID LETTER25 Feb 2021View ↗
ACOUSTIC REPORT17 Feb 2021View ↗
View Application Page ↗
Data from the Westminster planning register.
Summary
Reference
20/07867/FULL
Type
Full Planning Permission Application
Applicant
Mr Rob Cotton
Submitted
9 Dec 2020
Decision date
15 Jun 2021
Officer
Council
Decision
Refused
Decision route
Delegated (officer)
How long, really
27
wks · this application
Submission → decision · 19 wks over the 8-week target
Public response
Objections
0
In support
0
Total comments
0