How Wandsworth actually applies LP10: who leans on it, where it bites hardest, and how often it's invoked. The policy text is the rule; this is the behaviour.
LP10 is a published Wandsworth planning policy. This page records where it appears in the council's published planning decisions.
Cited under: Wandsworth Local Plan (adopted)
Wandsworth · LP10
Where LP10 is quoted — by ward
Fewer ~0More citations ~47
Showingre-scopes the headline figures and the trend
303
times cited
in parsed decision notices
2 appeals
appeal survival
1 dismissed · 1 allowed at appeal — too few to rate
31 of 67
officer reach
46% of officers recorded in this period
Tooting Broadway
top hotspot ward
47 citations
What this policy is about
This policy requires new developments to be sustainable and reduce carbon emissions to help the council reach zero carbon by 2050. It mandates high standards for design, construction, and energy efficiency, including using recycled materials, water conservation, and green roofs. Major developments must achieve zero carbon standards, with options for financial contributions if on-site targets cannot be met. All developments must also be resilient to climate change impacts like overheating.
Plain-English summary of the adopted policy text below. The full text is the rule; this is the gist.
The policy — as adopted
Responding to the Climate Crisis
Sustainable Construction and Design
A. Developments will be required to achieve high standards of sustainable design and construction in order to mitigate the effects of climate change, and to realise the Council’s ambition of becoming zero carbon by 2050. In order to mitigate the effects of climate change and achieve the Council’s target of becoming a zero-carbon borough by 2050, development proposals should:
1. Incorporate the London Plan’s circular economy principles at the start of the design process.
2. Submit a Whole Life Cycle Assessment for all major applications.
3. Incorporate Sustainable Drainage Systems (SuDS) or demonstrate that any proposed alternative sustainable approaches to the management of surface water will be equally effective.
4. Use sustainable construction methods and sustainably sourced and recycled materials, and maximise the use of the river for freight.
5. Retain existing buildings and their embodied carbon in renewal and regeneration projects where this is a viable option.
6. Re-use any demolished materials in-situ where practicable, in order to minimise the transportation of materials and waste, reduce the need for mineral extraction and reduce carbon emissions.
7. Incorporate water conservation measures, to meet a maximum water efficiency standard of 110 litres per person per day for homes (including an allowance of five litres or less per person per day for external water consumption). Planning conditions will be applied to new residential development to ensure that the water efficiency standards are met.
8. Incorporate green roofs and walls wherever possible (see LP57 Urban Greening Factor for additional green features).
B. Development proposals will be required to meet the following:
1. New non-residential buildings over 100 sqm will be required to meet BREEAM ‘Outstanding’ standard, unless it can be demonstrated that this would not be technically feasible. New buildings should be designed taking into account changes to the climate over their lifespan.
2. Where proposals are for a change of use to residential, they will be required to meet BREEAM Domestic Refurbishment ‘Outstanding’ standard, unless it can be demonstrated that this would not be technically feasible.
3. New residential development will be expected to meet the BRE Home Quality Mark or Passivhaus standards wherever practicable.
Reducing Carbon Dioxide Emissions
C. Development proposals will be required to incorporate measures which improve energy conservation and efficiency, as well as contribute to renewable and low carbon energy generation. Proposals will be required to meet the following minimum reductions in carbon emissions:
1. All new major development should achieve zero carbon standards, as set out in the London Plan, with a minimum on-site reduction of 35%.
2. All non-major new residential development provided in new buildings should achieve a minimum on-site reduction of 35%.
3. Residential development should achieve at least a 10% reduction and non-residential development should achieve at least a 15% reduction through the use of energy efficiency measures.
4. In exceptional circumstances, where it is clearly demonstrated that the on-site percentage threshold targets listed in Parts C.1 and C.2 above cannot be fully achieved, any shortfall must be addressed by making a financial contribution to the Council’s Carbon Offset Fund.
5. Development, including the re-use or extension of existing buildings, should achieve the maximum feasible reductions in carbon emissions and support in achieving the strategic carbon reductions target set out in this Plan, while protecting the heritage and character of the buildings.
The Energy Hierarchy
D. All development is required to follow the energy hierarchy set out within the London Plan (Policy SI2) with respect to its design, construction, and operation.
Energy Assessments
E. All new residential development and major non-residential development proposals are required to submit an energy assessment, and minor non-residential development proposals are strongly encouraged to provide one.
Compliance and Monitoring
F. Major development proposals will be required to provide, or fund the provision of, post-construction monitoring of renewable and low-carbon equipment to demonstrate full compliance with the commitments identified within the permission, for a period of four years.
Adapting to Climate Change
G. The Council will expect all development to be fully resilient to the future impacts of climate change in order to minimise the vulnerability of people, property, the public realm and essential infrastructure to its effects. Retrofitting of existing buildings, through the use of low-carbon measures, to adapt to the likely effects of climate change should be maximised and will be supported.
Overheating
H. New development should, through its layout, design, construction, materials, landscaping, and operation, minimise the effects of overheating, mitigate the urban heat island effect, and minimise energy consumption in accordance with the cooling hierarchy set out in the Policy SI4 of the London Plan.
Verbatim from the adopted Wandsworth plan · source document. The council's published plan is the authoritative version.
How it lands
89% in approvals · 4% in refusals 303 citations in the selected period
The approval/refusal split is subscriber intelligenceUnlock →
Not filled in yet. This will hold how officers actually argue LP10 case by case, classified from their decision reports — the classification pass hasn't run. Nothing is paraphrased in its place.
What the published record shows
LP10 appears most often in Tooting Broadway, Balham, Thamesfield. It appears across 31 of 67 officers recorded in this period. The map shows the pattern for the selected period.
Who cites it — case-officer spreadfrom parsed decision notices · click an officer
Who leans on this policy — and how often — is subscriber intelligenceSubscribe to unlock →
Why it is cited — and what follows
89%
in approvals
271 citations
4%
in refusals
12 citations
This shows the decision reports in which LP10 appears. It does not yet claim that the policy caused those outcomes; 20 citations sit outside the approval/refusal split.
Reason · role · consequence
Not filled in yet — the classification pass over the citing passages hasn't run. When it has, this shows why LP10 was used, whether it supported approval or refusal, and what changed as a result. No conclusion is shown until that classification has been checked.
Why this policy is cited, and what follows, is subscriber intelligenceSubscribe to unlock →
From Planning Inspectorate decision letters that cite LP10. Dismissed = the council's refusal stood, the policy held; allowed = overturned. Too few decisive appeals for a rate — the counts are the record. The tighter join — this borough's own refusals citing LP10 traced to their specific appeals — is still to come.
Citations, officer spread, ward and application-type counts parsed from published Wandsworth decision notices (high-confidence parses, approvals and refusals), joined to the canonical application record. One citation = one decision citing the policy. See the policy overview for every policy cited.
Atlas intelligence summarises patterns and observations from published planning records. Past decisions do not indicate how any future application will be determined. Every application is assessed on its own merits, having regard to the proposal, site, evidence and policies applying at the time. This information is provided for general information only and is not planning, legal, financial or professional advice.