Development Intent
Planning AtlasMertonWimbledon Town And DundonaldApplication
Planning Application

23/P2170

BURLINGTON GATE, 42 Rothesay Avenue, Raynes Park, Merton

Full / Other PlanningWimbledon Town And Dundonald ward
Submission
2 Aug 2023
Target
22 Dec 2023
Decision
22 Dec 2023
Outcome
Approved
Committee decisionApproved
22 Dec 2023
Determined by the planning committee
Loading map…
Scheme description

CONVERSION OF ROOFSPACE OF SOUTH BLOCK, WITH AN INCREASE IN HEIGHT OF THE RIDGELINE BY 2.3M, TO PROVIDE 3 X SELF-CONTAINED FLATS (2 x 2B & 1 X 1B) WITH ASSOCIATED WORKS, INCLUDING THE FORMATION OF A NEW ROOF TERRACE, CYCLE STORE AND LANDSCAPING.

Parties
Applicant
Merton Park Holdings Ltd
Timeline
2 Aug 2023
Application submitted
22 Dec 2023
Committee decision: Approved
Supporting documents · 41
125 of 41
Proposed Amenity Space Roof.pdfView ↗
CIL Form 01.pdfView ↗
Existing East & North Elevation.pdfView ↗
Existing Ground Floor (including existing trees) Amended 16.View ↗
Proposed Site Plan.pdfView ↗
Existing Ground Floor.pdfView ↗
Proposed Roof.pdfView ↗
Existing Plans.pdfView ↗
Application Form Redacted.pdfView ↗
Mods Sheet.pdfView ↗
Comments_LBM Transport Planner_10.10.2023.pdfView ↗
Proposed East & North Elevation (showing summerhouse) 22.11.View ↗
Proposed 4th floor.pdfView ↗
Committee Report.pdfView ↗
Comments_LBM Highway Officer_11.08.2023.pdfView ↗
Proposed Roof Terrace Landscaping 22.11.2023.pdfView ↗
Proposed South & West Elevation.pdfView ↗
Air Quality Neutral Statement_06.09.2023..pdfView ↗
Air Quality Neutral Statement_06.09.2023.pdfView ↗
Proposed Ground Floor.pdfView ↗
Design and Access Statement.pdfView ↗
S106 Redacted.pdfView ↗
Energy Statement.pdfView ↗
Proposed Roof (showing previously proposed amenity space) AmView ↗
Proposed Site Plan (showing proposed bin storage and rooftopView ↗
View Application Page ↗
Data from the Merton planning register.
Summary
Reference
23/P2170
Type
Full Planning Permission
Applicant
Merton Park Holdings Ltd
Submitted
2 Aug 2023
Decision date
22 Dec 2023
Council
Decision
Approved
Decision route
Committee
How long, really
20
wks · this application
Submission → decision · 12 wks over the 8-week target