Development Intent
Planning AtlasLewishamPerry ValeApplication
Planning Application

DC/26/142626

102 PERRY HILL, LONDON, SE6 4EY

Full / Other PlanningPerry Vale wardPublic Transport Accessibility Level - 2: PTAL 2
Submission
12 Jan 2026
Target
10 Mar 2026
Decision
24 Mar 2026
Outcome
Refused
Delegated decisionRefused
24 Mar 2026
Decided by Amanda Ghani under delegated powers
Loading map…
Scheme description

Change of use from dwellinghouse (C3) to House in Multiple Occupancy (C4), at 102 Perry Hill SE6 4EY

Why it was refused
Reason 1

The proposed development by reason of its low PTAL rating of 2 would not be located in an accessible area that is well connected to local walking, cycling, and public transport services. Furthermore, the gross original internal floorspace of the dwelling is less than the 130sqm min. requirements which would result in the loss of a modest-sized family home within an area subject to an Article 4 Direction removing permitted development rights for such changes of use and undermines the supply of small family homes in the borough of which there is an identified need. The development is therefore contrary to the NPPF (2024), Policies GG1 and T4 of the London Plan (2021), and Policies HO8 and TR1 of the Lewisham Local Plan (July 2025).

Policies cited
GG1
T4
HO8
TR1
NPPF
Parties
Applicant
Beitel Care Services Limited
Timeline
12 Jan 2026
Application submitted
13 Jan 2026
Application validated
24 Mar 2026
Delegated decision: Refused
Supporting documents · 9
Delegated report24 Mar 2026View ↗
Decision notice24 Mar 2026View ↗
Parking stress survey report12 Jan 2026View ↗
6750-2112 Jan 2026View ↗
Existing drawings12 Jan 2026View ↗
Proposed drawings12 Jan 2026View ↗
Planning statement12 Jan 2026View ↗
Redacted12 Jan 2026View ↗
6750-2012 Jan 2026View ↗
View Application Page ↗
Data from the Lewisham planning register.
Summary
Reference
DC/26/142626
Type
Full Planning Permission
Applicant
Beitel Care Services Limited
Submitted
12 Jan 2026
Decision date
24 Mar 2026
Council
Decision
Refused
Decision route
Delegated (officer)
How long, really
10
wks · this application
Submission → decision · 2 wks over the 8-week target
Public response
Objections
0
In support
0
Total comments
0