RIVERSIDE YOUTH CENTRE, GROVE STREET, LONDON, SE8 3QQ

Full / Other PlanningEvelyn wardPublic Transport Accessibility Level - 2: PTAL 2
Submission
9 Mar 2020
Target
11 Jun 2020
Decision
3 Jul 2020
Outcome
Approved
Delegated decisionApproved
3 Jul 2020
Decided by Vincent Murphy under delegated powers
Loading map…
Scheme description

The construction of a single storey extension to the� north �elevation, a�two-storey extension to the�front (east)�elevation, the construction of raised platforms (terraces) to the north, east and west elevations, and the construction of extensions at second-floor level, together with window enlargements and replacements, resurfacing and re-configuration of the existing courts to an all-weather polymetric surface to form two pitches (including re-fencing and new internal fencing and the addition of a mesh cover over the reconfigured main court.) at Riverside Youth Centre, 185 Grove Street, SE8.

Parties
Applicant
Not disclosed
Ward
Evelyn
Timeline
9 Mar 2020
Application submitted
16 Apr 2020
Application validated
3 Jul 2020
Delegated decision: Approved
Supporting documents · 15
Decision notice3 Jul 2020View ↗
Site plan20 Apr 2020View ↗
Proposed sections20 Apr 2020View ↗
Location plan20 Apr 2020View ↗
Elevations20 Apr 2020View ↗
Survey second floor20 Apr 2020View ↗
Survey ground floor20 Apr 2020View ↗
Survey first floor20 Apr 2020View ↗
Survey elevations floor20 Apr 2020View ↗
[1] a1_10016 Apr 2020View ↗
Plans16 Apr 2020View ↗
Existing elevatiions2 Apr 2020View ↗
Redacted copy10 Mar 2020View ↗
Sustainability10 Mar 2020View ↗
Planning statement10 Mar 2020View ↗
View Application Page ↗
Data from the Lewisham planning register.
Summary
Reference
DC/20/116072
Ward
Type
Full Planning Permission
Applicant
Not disclosed
Submitted
9 Mar 2020
Decision date
3 Jul 2020
Council
Decision
Approved
Decision route
Delegated (officer)
How long, really
17
wks · this application
Submission → decision · 9 wks over the 8-week target
Public response
Objections
0
In support
0
Total comments
0