Planning Application

25/00495/LB

Imperial Court 225 Kennington Lane London SE11 5QN

Listed BuildingKennington wardConservation Area: CA8 : Kennington Conservation Area
Submission
17 Feb 2025
Target
14 Apr 2025
Decision
14 Apr 2025
Outcome
Refused
Delegated decisionRefused
14 Apr 2025
Decided by Nadia Harper under delegated powers
Loading map…
Scheme description

Upgrade existing copper infrastructure to full fibre. involving installation of fibre entry box above flat door.

Why it was refused
Reason 1

The proposed works are considered to cause a low level of less than substantial harm to the listed building due to the excessive visual clutter that results from the installation for further cabling, boxes and trunking, In addition to this insufficient information has been submitted to fully assess the harm caused as the submission fails to include full floor plans showing existing locations of cables and boxes, along with the locations of the riser cupboards, or full details of the size and exact positioning of the trunking. The proposal is therefore contrary to policy Q20 of the Local Plan (2021) and the 'Lambeth Design Guide' Supplementary Planning Document (2023) and fails to accord with paragraph 208 of the NPPF.

Policies cited
Q20
NPPF
Parties
Applicant
Asset Management Team
Timeline
17 Feb 2025
Application submitted
14 Apr 2025
Delegated decision: Refused
Supporting documents · 9
Decision Notice14 Apr 2025View ↗
DELEGATED REPORT14 Apr 2025View ↗
Site Notice14 Apr 2025View ↗
APPLICATION FORM - WITHOUT PERSONAL DATA17 Feb 2025View ↗
HERITAGE STATEMENT17 Feb 2025View ↗
Plans17 Feb 2025View ↗
COMMUNITY INFRASTRUCTURE LEVY - COMPLETED FORM17 Feb 2025View ↗
THE LOCATION PLAN17 Feb 2025View ↗
DESIGN AND ACCESS STATEMENT17 Feb 2025View ↗
View Application Page ↗
Data from the Lambeth planning register.
Summary
Reference
25/00495/LB
Type
Listed Building Consent
Applicant
Asset Management Team
Submitted
17 Feb 2025
Decision date
14 Apr 2025
Council
Decision
Refused
Decision route
Delegated (officer)
How long, really
8
wks · this application
Submission → decision
Public response
Objections
0
In support
1
Total comments
1