Carmellena Hickey.
Active — last recorded decision May 2026
A case officer at Kingston Upon Thames with an approval rate of 69% across 1,555 decided planning applications, spanning 35 wards.[1] Decision speed and appeal performance publish when decision notices are ingested.
Topic mentions per 1,000 words of their own report text (boilerplate stripped), indexed against all parsed Kingston Upon Thames reports. Attention, not stance.
Mark = borough average (1×). Bar capped at 2×.
Hickey's caseload spans the full range of Kingston's householder/full-application/certificate-of-lawfulness mix and is distinctive for a settled, formulaic 'proportionate and subordinate addition' finding on ordinary rear/side extensions, checked before she moves to a depth/height/eaves-height quantification of neighbouring-amenity impact framed against the specific adjoining property. On larger full applications she runs the housing-need and space-standard tests methodically against the Council's Housing Needs Assessment and the London Plan's Policy D6 GIA/ceiling-height thresholds, and on Certificate of Lawful Use (CPU/CEU) applications she applies the Section 55 'material change of use'/'building operations' legal test rigorously, citing named case law (the 'Woolley Chickens' and Skerrits judgments) to determine whether a structure counts as development before reaching any planning merits question.
· on ordinary householder extensions, opens with a 'proportionate and subordinate addition' finding keyed to the extension's depth/width/height in metres, before any streetscene or amenity discussion
· on full applications for new dwellings, runs the London Plan Policy D6 GIA/ceiling-height/dual-aspect space-standard checklist methodically against the Council's own Housing Needs Assessment housing-mix targets
· on Certificate of Lawful Use (CPU/CEU) applications, applies the Section 55 Town and Country Planning Act 1990 'material change of use'/'building operations' test with named case-law citations (Woolley Chickens, Skerrits, Hall Hunter) before considering any planning merits
· whether the extension's depth/width/height keeps it 'subordinate' to the host dwelling before any streetscene assessment
· whether the proposed GIA, ceiling height and dual-aspect provision meet the London Plan Policy D6 minimum space standards
· whether a structure or change of use satisfies the Section 55(1) definition of 'development', tested against named case law rather than a general impression
“it is considered that the proposed changes would cause no harm to the character and appearance of the area, or cause an unacceptable adverse impact upon the amenity of neighbouring occupiers”
20/00535/FUL
“The overall GIA, bedroom sizes and storage space would be compliant with LP Policy D6”
20/00863/FUL
Measured from 498 published Kingston Upon Thames officer reports written by this officer, with recited policy boilerplate stripped before any counting. These describe how this officer works and writes — they are not outcome predictions. Every quote is from a named public report.
The policies this officer cites most in their own reports — times cited across 498 parsed reports. Whether refusals citing each survive appeal isn't traced per policy yet.
Show all 35 rows
Where this officer's caseload concentrates, 2020–26.[1] Click the map above to focus this page on a ward, or a row to open the ward.
- [1]Applications decided, approval rate, per-year trend and ward breakdown — London Borough of Kingston Upon Thames planning register and published decision notices, 2020–26. · methodology
- [2]Appeal overturn and decision-time benchmarks — Planning Inspectorate (PINS) appeal decisions and application date pairs; not yet computed per officer, shown as a dash until they are. · PINS appeals casework
- [3]Condition load — mean effective conditions attached to Kingston Upon Thames decision notices (grant/split), parsed from the published notice text; a borough figure, not yet split per case officer.
- [4]"How this officer decides", the policy playbook and all quotes — parsed from 498 published Kingston Upon Thames officer reports written by this officer, recited policy boilerplate stripped before counting; disposition text coded from their own reasoning with every quote machine-verified verbatim. Descriptive of how they work — not outcome predictions.