Planning Application
LB/25/06009
1 and 2, The Boltons, London, SW10 9TB
Listed BuildingRedcliffe ward
Submission
1 Oct 2025
Target
26 Nov 2025
Decision
5 Mar 2026
Outcome
Withdrawn
Delegated decisionWithdrawn
5 Mar 2026Decided by Neville Palmer under delegated powers
Loading map…
Scheme description
***Withdrawn***Reversion of single dwellinghouse to 2no semi-detached dwellings, associated internal alterations and regularisation of other alterations. Rear extension and alterations at lower and upper ground floor of no.1. Reinstatement of rear garden wall and external alterations including replacement windows and doors to rear elevation of no.2. Roof repairs, replacement slate tiles and replacement condensing units in roof valley
Parties
Timeline
1 Oct 2025
Application submitted
5 Mar 2026
Delegated decision: Withdrawn
Supporting documents · 44
1–25 of 44
500 External Materials Schedule17 Oct 2025View ↗
QF11617 PF7837 PF7741 RP1A 29 0917 Oct 2025View ↗
Photographs and photomontagesincludedinHeritage statement17 Oct 2025View ↗
Appendix 2 No2 The Boltons parking permit letter17 Oct 2025View ↗
TJA Drawings 241218 - 000 Existing GAs17 Oct 2025View ↗
4959-E-312-T 1F High Level Lighting17 Oct 2025View ↗
FeeCalculation17 Oct 2025View ↗
4959 250930 Rooftop Plant Operation for Noise Levels jp17 Oct 2025View ↗
Heritage Statement - 1-2 The Boltons - Part 3 V17 Oct 2025View ↗
Appendix 2 No1 The Boltons Parking Permit Letter17 Oct 2025View ↗
712A Internal Finishes - 1F at N17 Oct 2025View ↗
4959-E-311-T UGF High Level Lighting17 Oct 2025View ↗
TJA Drawings 250926 - 200 Proposed GAs17 Oct 2025View ↗
Heritage Statement - 1-2 The Boltons - Part 1 V17 Oct 2025View ↗
Planning statementincludedinDesign and access statement17 Oct 2025View ↗
Detail DrawingincludedinAdditional plans17 Oct 2025View ↗
4959-E-310-T LGF High Level Lighting17 Oct 2025View ↗
TJA Drawings 250919 - 100 Demolitions GAs17 Oct 2025View ↗
Fire Prevention Strategy 1-2 The Boltons17 Oct 2025View ↗
002 Location Plan and Block Plan17 Oct 2025View ↗
711B Internal Finishes - UGF at N17 Oct 2025View ↗
4959-E-300-T LGF Low Level Lighting17 Oct 2025View ↗
540A Envelope Details - Roof Details17 Oct 2025View ↗
AttachmentSummary17 Oct 2025View ↗
Jasnon McCarthy Roof report No 1-2 The Boltons17 Oct 2025View ↗
Summary
Reference
LB/25/06009
Ward
Type
Listed Building Consent
Applicant
Debs
Submitted
1 Oct 2025
Decision date
5 Mar 2026
Officer
Council
Decision
Withdrawn
Decision route
—
How long, really
22
wks · this application
Submission → decision · 14 wks over the 8-week target