Planning Application
LB/25/02223
26-28 Pont Street, London, SW1X 0AB
Listed BuildingBrompton and Hans Town ward
Submission
28 Mar 2025
Target
23 Jun 2025
Decision
10 Jun 2025
Outcome
Approved
Delegated decisionApproved
10 Jun 2025Decided by Neville Palmer under delegated powers
Loading map…
Scheme description
Replacement of existing French door sets with slimline timber framed, double-glazed French doors to match existing and replacement of 2 sash windows with French doors with slimeline double glazing.
Parties
Timeline
28 Mar 2025
Application submitted
28 Apr 2025
Application validated
10 Jun 2025
Delegated decision: Approved
Supporting documents · 20
MFG9594A50226.28 PONT STREETPROPOSED SASH WINDOW AND DOOR DE10 Jun 2025View ↗
Planning statementincludedinDesign and access statement15 Apr 2025View ↗
MFG9594A20026.28 PONT STREETEXISTING FRONT ELEVATION10 Jun 2025View ↗
AttachmentSummary15 Apr 2025View ↗
FeeCalculation15 Apr 2025View ↗
ELEVATION (FRONT) - PROPOSEDINCLUDEDINDETAIL DRAWING10 Jun 2025View ↗
MFG9594A10026.28 PONT STREETLOCATION AND SITE MAP10 Jun 2025View ↗
LINK TO PP/25/02222 ALL DOCUMENTS15 Apr 2025View ↗
MFG9594A20126.28 PONT STREETEXISTING SIDE ELEVATION10 Jun 2025View ↗
MFG9594Document Issue Sheet15 Apr 2025View ↗
MFG9594A50026.28 PONT STREETEXISTING SASH WINDOW AND DOOR DE10 Jun 2025View ↗
RegisterIssue sheetincludedinOther relevant information15 Apr 2025View ↗
Decision Notice10 Jun 2025View ↗
ELEVATION (FRONT) - EXISTINGINCLUDEDINDETAIL DRAWING10 Jun 2025View ↗
Photographs and photomontagesincludedinDesign and access sta15 Apr 2025View ↗
ELEVATION (FRONT) - EXISTINGINCLUDEDINDETAIL DRAWING10 Jun 2025View ↗
MFG9594 - 26-28 Pont Street - Design Access and Heritage Sta15 Apr 2025View ↗
Report (Officers)10 Jun 2025View ↗
MFG9594A50126.28 PONT STREETEXISTING SASH WINDOW AND DOOR DE10 Jun 2025View ↗
Heritage statementincludedinDesign and access statement15 Apr 2025View ↗
Summary
Reference
LB/25/02223
Type
Listed Building Consent
Applicant
c o HLM Property Management
Submitted
28 Mar 2025
Decision date
10 Jun 2025
Officer
Council
Decision
Approved
Decision route
—
How long, really
11
wks · this application
Submission → decision · 3 wks over the 8-week target