Development Intent
AtlasHarrowOfficersLuke Boadle
Case officer · Harrow Planning

Luke Boadle.

Active — last recorded decision May 2026

A case officer at Harrow with an approval rate of 93% across 99 decided planning applications, spanning 22 wards.[1] Decision speed and appeal performance publish when decision notices are ingested.

Planning officer99 decisions93% approvalSave
Harrow · ward map
Approval rate — by ward
Lower ~68%
Higher ~90%
ShowingAll years · subscriber →across all years on record — a period re-scopes the headline figures and the trend
At a glanceEach metric links to the investigation behind it
All investigations →
99
Applications
2025–26
Approval rate over time — tougher or softer 🔒Dashed line = London average
avg 81%96%202592%2026
Approval-rate trend is subscriber dataSubscribe to see the trend →
What they decide — by application type
How they compareVersus peers
Approval rate93% · 3rd of 72
higher is betterdashed = London avg
Decision time · publishes with decision notices
in development
Appeal overturn · publishes with decision notices
in development
How this officer decides — from their own reports130 officer reports parsed
2%
Approves despite concerns
of approvals record a documented reservation
6%
Negotiated approvals
approvals mentioning revisions/amendments
0%
"On balance" reports
reports using explicit balancing language
58%
Bespoke reasoning
of report text written for the case, not recited
What they write about — vs Harrow's average officer

Topic mentions per 1,000 words of their own report text (boilerplate stripped), indexed against all parsed Harrow reports. Attention, not stance.

Flooding & drainage
2.48× borough avg
Materials & detailing
1.16× borough avg
Character & heritage
0.7× borough avg
Daylight & sunlight
0.6× borough avg
Bulk & massing
0.56× borough avg

Mark = borough average (1×). Bar capped at 2×.

How they reason — coded from their reports

Boadle's amenity paragraphs are distinctive for naming specific comparator properties by address ('e.g. 71 Yeading Avenue and 83 Yeading Avenue') when justifying a numerically non-compliant outbuilding or extension, and he is explicit about labelling a variation as 'very minor' or 'minor and justifiable' when accepting small numerical breaches, rather than presenting the breach as fully compliant. His drainage paragraphs consistently reproduce the Council's Drainage & Infrastructure Officer's own comment text as a discrete quoted block.

Observable habits

· names specific comparator properties by street address when justifying a numerically non-compliant scheme, rather than a generic 'similar examples exist' statement

· explicitly labels small numerical breaches as 'very minor' or 'minor and justifiable' rather than silently treating them as compliant

· reproduces the Drainage & Infrastructure Officer's consultee comment as its own discrete quoted block before reaching a drainage conclusion

What their reports consistently look for

· what this officer's reports consistently look for: a specific named comparator property address with a similar-scale non-compliant feature, not a generic precedent claim

· what this officer's reports consistently look for: whether a numerical breach is 'very minor'/'minor and justifiable' in scale, explicitly labelled as such rather than glossed over

· what this officer's reports consistently look for: the Drainage & Infrastructure Officer's own quoted assessment of a Flood Risk Assessment before reaching a drainage conclusion

Assigned Luke Boadle on a live case?What they pay attention to, how they reason, and what their reports consistently look for — so you can address it before they raise it.Subscribe to unlock →
In their own words

there are multiple examples of similarly sized detached outbuildings in the rear yards of dwellings in the vicinity of the subject site (e.g. 71 Yeading Avenue and 83 Yeading Avenue)

PL/1073/25

Whilst non-compliant with this numerical control, the noncompliance is considered very minor

PL/1493/25

Measured from 130 published Harrow officer reports written by this officer, with recited policy boilerplate stripped before any counting. These describe how this officer works and writes — they are not outcome predictions. Every quote is from a named public report.

Policy playbook — what this officer cites[3]

The policies this officer cites most in their own reports — times cited across 130 parsed reports. Whether refusals citing each survive appeal isn't traced per policy yet.

D3
2 times cited
D12
2 times cited
CS1.B
2 times cited
DM1Achieving a High Standard of Development
1 times cited
DM10On Site Water Management and Surface Water Attenuation
1 times cited
D6
1 times cited
Which policies this officer leans on is subscriber intelligenceSubscribe to unlock →
Decisions by ward

Where this officer's caseload concentrates, 2025–26.[1] Click the map above to focus this page on a ward, or a row to open the ward.

Recent applications
Address
Reference
Type
Outcome
Date
PL/0941/26
Householder
Approved
2026-06-03
PL/3205/25
Householder
Approved
2026-06-01
PL/0941/26
Householder
Approved
2026-06-03
PL/3205/25
Householder
Approved
2026-06-01
Full application history locked
Subscribe to see all 99 decisions →
Consultants approved most— subscriber data
1. KRN Design Studio
2. Construct 360 T/AS DontMoveExtend.com
3. KDB Building Designs Ltd
4. AVIM Consultancy Ltd
At a glance
OfficerLuke Boadle
BoroughHarrow
RolePlanning officer
Experience
Applications99 (2025–26)
Approval rate93%
London approval avg81%
Who decides here
GovernmentMayor of LondonCouncilCommitteeOfficersDecisionsApplicantsInspectorate
Related investigations
When committees overrule officers like this one →
How often members depart from officer recommendations, and how those overrides fare at appeal.
How much gets decided without a committee →
The delegated share by borough and officer — where the real power over decisions sits.
Sources & method
  1. [1]Applications decided, approval rate, per-year trend and ward breakdown — London Borough of Harrow planning register and published decision notices, 2025–26. · methodology
  2. [2]Appeal overturn and decision-time benchmarks — Planning Inspectorate (PINS) appeal decisions and application date pairs; not yet computed per officer, shown as a dash until they are. · PINS appeals casework
  3. [3]Condition load — mean effective conditions attached to Harrow decision notices (grant/split), parsed from the published notice text; a borough figure, not yet split per case officer.
  4. [4]"How this officer decides", the policy playbook and all quotes — parsed from 130 published Harrow officer reports written by this officer, recited policy boilerplate stripped before counting; disposition text coded from their own reasoning with every quote machine-verified verbatim. Descriptive of how they work — not outcome predictions.
Methodology is published in full so every number is traceable to its primary source.