Planning Application

PL/2887/25

226 - 228 Kenton Road, Kenton, Harrow, HA3 8BZ

Full / Other PlanningKenton West ward
Submission
7 Nov 2025
Target
13 Feb 2026
Decision
9 Mar 2026
Outcome
Refused
Delegated decisionRefused
9 Mar 2026
Decided by Chris Wentworth under delegated powers
Loading map…
Scheme description

Demolition and redevelopment to provide two storey building with basement level and habitable roofspace comprising of 26 bed House of Multiple Occupancy (HMO)

Why it was refused
Reason 1

- Loss of office accommodation The proposal has failed to provide any form of evidence, including details regarding all opportunities to re-let the accommodation being fully explored, and evidence of suitable marketing for a period of at least 12 months, regarding the loss of office accommodation in this location. The proposal has therefore failed to accord with Policy DM32 the Development Management Policies Local Plan (2013) and Policy LE1 within the Harrow Local Plan (2021-2041) (Draft).

Reason 2

- Over-intensification use of site The proposed development, by reason of a high concentration of bedroom accommodation, the lack of any communal areas on each floor with bedroom accommodation and poor quality external amenity space, would result in an over intensive form of development on site to the detriment of neighbouring occupiers and future occupiers of the proposed development. The proposal is therefore contrary to the National Planning Policy Framework (2024), Policy H16 of the London Plan (2021), Policy DM30 of the Development Management Policies Local Plan (2013) and Policies GR1 and HO10 within the Harrow Local Plan (2021-2041) (Draft).

Reason 3

- Basement Provision The proposal has failed to provide sufficient information, in the form of a construction method statement, to adequately assess the suitability of basement provision in this location. As such, the proposal is therefore contrary to the National Planning Policy Framework (2024), Policy D10 of the London Plan (2021), Policy DM1 of the Development Management Policies Local Plan (2013) and Policy GR4A of the Harrow Local Plan (2021-2041) (Draft).

Reason 4

- Flooding and Drainage The proposal, by reason of insufficient information relating to flooding and drainage impacts, has failed to demonstrate that the proposed development would result in a net reduction in flood risk, be resistant and resilient to flooding and would not exacerbate the risk of flooding within the site or increase the risk and consequences of flooding elsewhere. The proposal is therefore contrary to the National Planning Policy Framework (2024), Policies SI12 and SI13 of the London Plan (2021), Core Policy CS1 U of the Harrow Core Strategy (2012), Policies DM9 and DM 10 of the Development Management Policies Local Plan (2013) and Policies CN1 and CN3 within the Harrow Local Plan (2021-2041) (Draft).

Reason 5

- Secure By Design The proposed development would result in adverse amenity impacts for future occupiers of the development through the provision of a poor quality internal layout, the lack of defensible space at ground floor level, lack of building security measures throughout the building for occupants or any form of management plan which would result in poor levels of security and safety for future residents and neighbouring occupiers. The proposal is therefore contrary to the National Planning Policy Framework (2024), Policies GG1, D4, D5 and H16 of the London Plan (2021), Policies DM1 and DM30 of the Harrow Local Plan (2013) and Policies GR1 and HO10 within the Harrow Local Plan (2021-2041) (Draft).

Reason 6

- External Amenity Space The proposal, by reason of its very limited provision and poor quality external amenity space for 26 no. residents, would result in a poor quality residential environment for future occupiers and would be contrary to the high quality design aspirations of National Planning Policy Framework (2023), Policies D3 (D1) and (D11) of The London Plan (2021), Core Policy CS1.B of The Harrow Core Strategy (2012), Policies DM1 and DM27 of the Harrow Development Management Policies Local Plan (2013) and Policies GR1 and HO10 within the Harrow Local Plan (2021-2041) (Draft).

Policies cited
H16
DM30
NPPF
D10
DM1
GR4A
SI12
SI13
DM9
DM10
GG1
D4
D5
DM27
Parties
Applicant
Vish Palasuntheram
Timeline
7 Nov 2025
Application submitted
19 Dec 2025
Application validated
9 Mar 2026
Delegated decision: Refused
Supporting documents · 45
125 of 45
Decision Notice9 Mar 2026View ↗
Officer Report2 Mar 2026View ↗
Police Design Response24 Feb 2026View ↗
Resident Objection24 Feb 2026View ↗
Drainage/Agent Discussions24 Feb 2026View ↗
Policy Response24 Feb 2026View ↗
EHO-Officer-Response-Kenton-Road.3 Feb 2026View ↗
Transport-Officer-Response3 Feb 2026View ↗
Drainage Officer Response - Objection3 Feb 2026View ↗
Fire Statement5 Jan 2026View ↗
Fire Statement22 Dec 2025View ↗
CIL Form17 Dec 2025View ↗
Transport Assessment17 Dec 2025View ↗
Noise Assessment17 Dec 2025View ↗
Appeal Final Decision10 Dec 2025View ↗
Appeal Decision10 Dec 2025View ↗
Proposed Plans10 Dec 2025View ↗
Pre-App Report10 Dec 2025View ↗
Bat Survey7 Nov 2025View ↗
Roost Assessment7 Nov 2025View ↗
Bat Survey7 Nov 2025View ↗
Flood Risk Assessment7 Nov 2025View ↗
SuDs Report7 Nov 2025View ↗
Drainage Report7 Nov 2025View ↗
Design & Access Statement7 Nov 2025View ↗
View Application Page ↗
Data from the Harrow planning register.
Summary
Reference
PL/2887/25
Type
Full Planning Application
Applicant
Vish Palasuntheram
Submitted
7 Nov 2025
Decision date
9 Mar 2026
Council
Decision
Refused
Decision route
How long, really
17
wks · this application
Submission → decision · 9 wks over the 8-week target