Planning Application
2025/03319/FUL
45 Orbain Road London SW6 7JZ
Full / Other PlanningMunster ward
Submission
27 Nov 2025
Target
12 Feb 2029
Decision
12 Feb 2026
Outcome
Approved
Delegated decisionApproved
12 Feb 2026Decided by Rachael Osinuga under delegated powers
Loading map…
Scheme description
Erection of a rear roof extension involving an increase in the ridge height by 200mm; erection of rear extension at second floor level, over part of the existing back addition; erection of a single storey rear extension, to the side of the existing back addition, following the partial demolition of the existing ground floor back addition; installation of 3no. rooflights to front roof slope; installation of new windows to the front elevation; and installation of new doors and a window to the rear elevation at ground floor level.
Parties
Timeline
27 Nov 2025
Application submitted
4 Dec 2025
Application validated
12 Feb 2026
Delegated decision: Approved
Supporting documents · 23
APPLICATIONFORMREDACTEDView ↗
01---45OR.01-LOCATION-PLANView ↗
02---45OR.02-SITE-PLANView ↗
08---45OR.08-EX-PROP-ELEVATIONSView ↗
ELEVATION-(FRONT)---PROPOSED_INCLUDED_IN_ELEVATION-(FRONT)--View ↗
09---45OR.09-EX-PROP-ELEVATIONSView ↗
ELEVATION-(REAR)---PROPOSED_INCLUDED_IN_ELEVATION-(REAR)---EView ↗
10---45OR.10-EX-SECTIONView ↗
11---45OR.11-PROP-SECTIONView ↗
12---45OR.12-PROP-SITE-PLANView ↗
03---45OR.03-EX-GROUND-FLOOR-PLANView ↗
04---45OR.04-EX-FIRST-FLOOR-PLANView ↗
07---45OR.07-PROP-SECOND-FLOOR-PLANView ↗
05---45OR.05-PROP-GROUND-FLOOR-PLANView ↗
06---45OR.06-PROP-FIRST-FLOOR-PLANView ↗
DESIGN-AND-ACCESS-STATEMENTView ↗
CILView ↗
EXISTING-ROOF-PLANView ↗
PROPOSED-ROOF-PLANView ↗
PROPOSED-SIDE-ELEVATIONView ↗
EXISTING-SIDE-ELEVATIONView ↗
PER.FULL-PLANNING-PERMISSIONView ↗
DELEGATED-REPORT-TEMPLATE---LIVEView ↗
View Application Page ↗
Data from the Hammersmith And Fulham planning register.
Summary
Reference
2025/03319/FUL
Ward
Type
Full Planning Application
Applicant
Ms M Simpson
Submitted
27 Nov 2025
Decision date
12 Feb 2026
Officer
Council
Decision
Approved
Decision route
—
How long, really
11
wks · this application
Submission → decision · 3 wks over the 8-week target