Planning Application
2025/03087/FUL
27 Crabtree Lane London SW6 6LP
Full / Other PlanningFulham Reach ward
Submission
5 Nov 2025
Target
8 Jan 2029
Decision
8 Jan 2026
Outcome
Approved
Delegated decisionApproved
8 Jan 2026Decided by Melissa Vingoe Wright under delegated powers
Loading map…
Scheme description
Erection of a rear extension at second floor level, over part of the existing back addition; and installation of a window to the side elevation of the existing back addition at first floor level.
Parties
Timeline
5 Nov 2025
Application submitted
6 Nov 2025
Application validated
8 Jan 2026
Delegated decision: Approved
Supporting documents · 22
APPLICATIONFORMREDACTEDView ↗
25507_A10E01_EXISTING-ELEVATIONS-AND-SECTIONSView ↗
ELEVATION-(REAR)---EXISTING_INCLUDED_IN_ELEVATION-(FRONT)---View ↗
ELEVATION-(SIDE)---EXISTING_INCLUDED_IN_ELEVATION-(FRONT)---View ↗
SECTION---EXISTING_INCLUDED_IN_ELEVATION-(FRONT)---EXISTINGView ↗
25507_A10E02_PROPOSED-ELEVATIONS-AND-SECTIONSView ↗
ELEVATION-(REAR)---PROPOSED_INCLUDED_IN_ELEVATION-(FRONT)---View ↗
ELEVATION-(SIDE)---PROPOSED_INCLUDED_IN_ELEVATION-(FRONT)---View ↗
SECTION---PROPOSED_INCLUDED_IN_ELEVATION-(FRONT)---PROPOSEDView ↗
25507_A10P01_EXISTING-PLANS-AND-LOCATION-SITE-PLANView ↗
LAYOUT-PLAN---EXISTING_INCLUDED_IN_FLOOR-PLAN---EXISTINGView ↗
SITEBLOCK-PLAN---EXISTING_INCLUDED_IN_FLOOR-PLAN---EXISTINGView ↗
25507_A10P02_PROPOSED-PLANS-AND-LOCATION-SITE-PLANView ↗
FLOOR-PLAN_INCLUDED_IN_BLOCK-PLAN-OF-THE-SITEView ↗
LAYOUT-PLAN---PROPOSED_INCLUDED_IN_BLOCK-PLAN-OF-THE-SITEView ↗
THE-LOCATION-PLAN_INCLUDED_IN_BLOCK-PLAN-OF-THE-SITEView ↗
25507_DESIGN-AND-ACCESS-STATEMENTView ↗
25507_FIRE-SAFETY-STRATEGY-COPYView ↗
25507_FORM_1_CIL_ADDITIONAL_INFORMATIONView ↗
OTHER-SIDE-ELEVATIONSView ↗
PER.FULL-PLANNING-PERMISSIONView ↗
DELEGATED-REPORT-TEMPLATE---LIVEView ↗
View Application Page ↗
Data from the Hammersmith And Fulham planning register.
Summary
Reference
2025/03087/FUL
Ward
Type
Full Planning Application
Applicant
Mr DAN WESTINGHOUSE
Submitted
5 Nov 2025
Decision date
8 Jan 2026
Officer
Council
Decision
Approved
Decision route
—
How long, really
9
wks · this application
Submission → decision · 1 wks over the 8-week target