Planning Application
2025/02344/FUL
39 Davisville Road London W12 9SH
Full / Other PlanningConingham ward
Submission
29 Aug 2025
Target
15 Dec 2028
Decision
15 Dec 2025
Outcome
Approved
Delegated decisionApproved
15 Dec 2025Decided by George Shakir under delegated powers
Loading map…
Scheme description
Erection of a rear roof extension; erection of a rear extension at second floor level over part of the existing back addition; erection of a single storey rear extension, to the side and rear of the existing back addition; installation of 3no rooflights in the front roofslope and 1no rooflight above the main flat roof at roof level; erection of obscure glazed screens in connection with the formation of a roof terrace at third floor level to the rear elevation, on top of the proposed second floor rear back addition; alterations to the roof of ground floor rear back addition; de-conversion of the existing building from 3no self-contained flats into a single family dwellinghouse.
Parties
Timeline
29 Aug 2025
Application submitted
4 Sep 2025
Application validated
15 Dec 2025
Delegated decision: Approved
Supporting documents · 15
APPLICATIONFORMREDACTEDView ↗
1.-SP_39_DAVISVILLEView ↗
LAYOUT-PLAN---EXISTING_INCLUDED_IN_ADDITIONAL-PLANSView ↗
LAYOUT-PLAN---PROPOSED_INCLUDED_IN_ADDITIONAL-PLANSView ↗
SITEBLOCK-PLAN---EXISTING_INCLUDED_IN_ADDITIONAL-PLANSView ↗
THE-LOCATION-PLAN_INCLUDED_IN_ADDITIONAL-PLANSView ↗
2.-CIL_QUESTIONSView ↗
3.-PLANNING-FIRE-SAFETY-STRATEGYView ↗
4.-FLOOD-RISK-ASSESSMENTView ↗
5.-DESIGN-AND-ACCESS-STATEMENTView ↗
SUDS,-RIVER-AND-SURFACE-WATER-FLOOD-RISK-REPORTView ↗
OFFICER-S-FILE-NOTEView ↗
COMPLETE-REVISED-PLAN-SETView ↗
SITE-PLANView ↗
PER.FULL-PLANNING-PERMISSIONView ↗
View Application Page ↗
Data from the Hammersmith And Fulham planning register.
Summary
Reference
2025/02344/FUL
Ward
Type
Full Planning Application
Applicant
Hugo Stagg
Submitted
29 Aug 2025
Decision date
15 Dec 2025
Officer
Council
Decision
Approved
Decision route
—
How long, really
15
wks · this application
Submission → decision · 7 wks over the 8-week target