Development Intent
Planning AtlasHammersmith And FulhamHammersmith BroadwayApplication
Planning Application

2025/01703/FUL

118 St Dunstan's Road London W6 8RA

Full / Other PlanningHammersmith Broadway ward
Submission
23 Jun 2025
Target
22 Sep 2028
Decision
22 Sep 2025
Outcome
Approved
Delegated decisionApproved
22 Sep 2025
Decided by Rachael Osinuga under delegated powers
Loading map…
Scheme description

Erection of a rear roof extension; erection of a rear extension at second floor level, over part of the existing back addition; erection of a single storey rear extension, to the side and rear of the existing back addition; and installation of 2no. rooflights in the front roofslope.

Parties
Applicant
Bickenhall Engineering Co. Limited
Timeline
23 Jun 2025
Application submitted
2 Jul 2025
Application validated
22 Sep 2025
Delegated decision: Approved
Supporting documents · 13
APPLICATIONFORMREDACTEDView ↗
118-ST-DUNSTANS-ROAD-CIL-FORMView ↗
118-ST-DUNSTANS-ROAD-LOCATION-PLANView ↗
118-ST-DUNSTANS-ROAD-SITE-PLANView ↗
118-ST-DUNSTANS-ROAD-EXISTING-ELEVATIONSView ↗
118-ST-DUNSTANS-ROAD-EXISTING-FLOOR-PLANSView ↗
118-ST-DUNSTANS-ROAD-LOCATION-PLAN-PROPOSEDView ↗
118-ST-DUNSTANS-ROAD-REAR-ELEVATION-AND-SURROUNDING-EXTENSIOView ↗
PROPOSED-FLOOR-PLANSView ↗
118-ST-DUNSTANS-ROAD-EXISTING-AND-PROPOSED-SIDE-ELEVATIONSView ↗
PROPOSED-ELEVATIONS-REV-BView ↗
PER.FULL-PLANNING-PERMISSIONView ↗
DELEGATED-REPORT-TEMPLATE---LIVEView ↗
View Application Page ↗
Data from the Hammersmith And Fulham planning register.
Summary
Reference
2025/01703/FUL
Type
Full Planning Application
Applicant
Bickenhall Engineering Co. Limited
Submitted
23 Jun 2025
Decision date
22 Sep 2025
Decision
Approved
Decision route
How long, really
13
wks · this application
Submission → decision · 5 wks over the 8-week target