Development Intent
Planning AtlasHammersmith And FulhamParsons Green And SandfordApplication
Planning Application

2025/01675/FUL

Flat A First Floor 61 Bradbourne Street London SW6 3TF

Full / Other PlanningParsons Green And Sandford ward
Submission
18 Jun 2025
Target
8 Dec 2028
Decision
8 Dec 2025
Outcome
Approved
Delegated decisionApproved
8 Dec 2025
Decided by Robert Cook under delegated powers
Loading map…
Scheme description

Erection of a front and rear roof extension involving an increase in the ridge height; installation of a sky lantern and an air conditioning unit with acoustic enclosure at main roof level of the new roof extension; alterations to part of the roof of back addition to form a flat roof, removal of the chimney stack and erection of obscure glazed screens in connection with the creation of a sunken roof terrace; installation of 1no new window facing Studdridge Street elevation, infilling of 1no existing window and replacement of 1no window with French doors and a Juliet balcony at first floor level to the rear elevation; installation of a new door opening at ground floor level facing Studdridge

Timeline
18 Jun 2025
Application submitted
25 Jun 2025
Application validated
8 Dec 2025
Delegated decision: Approved
Supporting documents · 15
NOISE-IMPACT-ASSESSMENT-REPORTView ↗
LOCATION-DRAWINGSView ↗
FLOOD-RISK-ASSESMENTView ↗
EXISTING-DRAWINGSView ↗
DESIGN-AND-ACCESS-STATEMENTView ↗
APPLICATIONFORMREDACTEDView ↗
1653---61A-BRADBOURNE-STREET---CIL-FORM-1View ↗
CERT-B---REDACTEDView ↗
OFFICER-S-FILE-NOTEView ↗
AC-UNIT-DATA-SHEETView ↗
ACOUSTIC-ENCLOSURE-SPECIFICATIONView ↗
(SUPERSED)-PROPOSED-TERRACE-PLANTER-DETAILSView ↗
REVISED-PROPOSED-PLANSView ↗
PER.FULL-PLANNING-PERMISSIONView ↗
DELEGATED-REPORT-TEMPLATE---LIVEView ↗
View Application Page ↗
Data from the Hammersmith And Fulham planning register.
Summary
Reference
2025/01675/FUL
Type
Full Planning Application
Applicant
Alison Brennan
Submitted
18 Jun 2025
Decision date
8 Dec 2025
Decision
Approved
Decision route
How long, really
25
wks · this application
Submission → decision · 17 wks over the 8-week target