Development Intent
Planning AtlasHammersmith And FulhamRavenscourtApplication
Planning Application

2025/01627/FUL

30 St Peter's Square London W6 9UH

Full / Other PlanningRavenscourt ward
Submission
13 Jun 2025
Target
22 Dec 2028
Decision
22 Dec 2025
Outcome
Approved
Delegated decisionApproved
22 Dec 2025
Decided by Zhirong Li under delegated powers
Loading map…
Scheme description

Demolition of the existing two store side infill extension at the lower-ground and upper-ground level; erection of a single storey extension to the rear and side at the lower-ground floor level; erection of a rear and side extension at the upper-ground level; alterations existing single storey side addition to includes alteration to the roof and installation of a rooflight and new front entrance doors; replacement of the existing timber framed single glazed windows to the front elevation at the lower-ground and first levels and rear elevation first and second levels to vacuum glazed windows; replacement of the existing timber framed single glazed windows to the front elevation at the first a

Timeline
13 Jun 2025
Application submitted
16 Jun 2025
Application validated
22 Dec 2025
Delegated decision: Approved
Supporting documents · 78
125 of 78
ARBORICULTURAL-IMPACT-ASSESSMENT--and--METHOD-STATEMENTView ↗
PLANNING-APPLICATION-METHOD-STATEMENTSView ↗
272-A1004-P1-EXISTING-SECOND-FLOOR-PLANView ↗
272-A1005-P1-EXISTING-LOFT-FLOOR-PLANView ↗
272-A1006-P1-EXISTING-ROOF-PLANView ↗
272-A1101-P1-EXISTING-SECTION-BBView ↗
272-A100-P1-EXISTING-LOCATION-PLANView ↗
272-A101-P1-EXISTING-SITE-BLOCK-PLANView ↗
272-A1000-P1-EXISTING-SITE-PLANView ↗
272-A1001-P1-EXISTING-LOWER-GROUND-FLOOR-PLANView ↗
272-A1003-P1-EXISTING-FIRST-FLOOR-PLANView ↗
272-A1300-P1-DEMOLITION-SITE-PLANView ↗
272-A1301-P1-DEMOLITION-LOWER-GROUND-FLOOR-PLANView ↗
272-A1302-P1-DEMOLITION-GROUND-FLOOR-PLANView ↗
272-A1304-P1-DEMOLITION-SECOND-FLOOR-PLANView ↗
272-A1305-P1-DEMOLITION-LOFT-FLOOR-PLANView ↗
272-A1306-P1-DEMOLITION-ROOF-PLANView ↗
272-A2904-P1-PROPOSED-SECOND-FLOOR-FIRE-STRATEGY-PLANView ↗
272-A2901-P1-PROPOSED-LOWER-GROUND-FLOOR-FIRE-STRATEGY-PLANView ↗
272-A2902-P1-PROPOSED-GROUND-FLOOR-FIRE-STRATEGY-PLANView ↗
272-A2903-P1-PROPOSED-FIRST-FLOOR-FIRE-STRATEGY-PLANView ↗
272-A4201-P1-PROPOSED-FIRST-FLOOR-PRINCIPAL-BEDROOM-ELEVATIOView ↗
272-A4202-P1-PROPOSED-FIRST-FLOOR-DRESSING-ELEVATIONSView ↗
272-A4001-P1-PROPOSED-LOWER-GROUND-FLOOR-SNUG-ELEVATIONSView ↗
272-A4002-P1-PROPOSED-LOWER-GROUND-FLOOR-STUDY-ELEVATIONSView ↗
View Application Page ↗
Data from the Hammersmith And Fulham planning register.
Summary
Reference
2025/01627/FUL
Type
Full Planning Application
Applicant
Reeves
Submitted
13 Jun 2025
Decision date
22 Dec 2025
Officer
Decision
Approved
Decision route
How long, really
27
wks · this application
Submission → decision · 19 wks over the 8-week target