Planning Application

2025/01075/FUL

8 Hugon Road London SW6 3EN

Full / Other PlanningPalace And Hurlingham ward
Submission
11 Apr 2025
Target
24 Jun 2028
Decision
24 Jun 2025
Outcome
Approved
Delegated decisionApproved
24 Jun 2025
Decided by Rachael Osinuga under delegated powers
Loading map…
Scheme description

Erection of a rear roof extension, involving an increase in the ridge height by 300mm; erection of a rear extension at second floor level, over part of the first floor back addition; erection of a rear extension at first floor level, on top of the existing ground floor back addition; erection of a single storey rear extension, to the side of existing back addition; installation of metal framed sliding folding doors following the removal of an existing window, to the rear elevation at ground floor level; installation of 2no. rooflights in the front roofslope.

Timeline
11 Apr 2025
Application submitted
14 Apr 2025
Application validated
24 Jun 2025
Delegated decision: Approved
Supporting documents · 23
LOCATION-PLANView ↗
EXISTING-SITE-PLANView ↗
PROPOSED-SITE-PLANView ↗
EXISTING-GROUND-AND-FIRST-FLOOR-PLANSView ↗
EXISTING-ROOF-PLANView ↗
EXISTING-CROSS-SECTION-AView ↗
EXISTING-FRONT-AND-REAR-ELEVATIONView ↗
EXISTING-CROSS-SECTION-BView ↗
EXISTING-CROSS-SECTION-CView ↗
PROPOSED-GROUND-AND-FIRST-FLOOR-PLANSView ↗
PROPOSED-SECOND-FLOOR-AND-ROOF-PLANView ↗
PROPOSED-CROSS-SECTION-AView ↗
PROPOSED-FRONT-AND-REAR-ELEVATIONView ↗
PROPOSED-CROSS-SECTION-BView ↗
PROPOSED-CROSS-SECTION-CView ↗
PLANNING-FIRE-SAFETY-STRATEGYView ↗
FLOOD-RISK-ASSESSMENTView ↗
FIRE-SAFETY-STATEMENTView ↗
DESIGN-AND-ACCESS-STATEMENTView ↗
APPLICATIONFORMREDACTEDView ↗
PROPOSED-SIDE-ELEVATIONView ↗
PER.FULL-PLANNING-PERMISSIONView ↗
DELEGATED-REPORT-TEMPLATE---LIVEView ↗
View Application Page ↗
Data from the Hammersmith And Fulham planning register.
Summary
Reference
2025/01075/FUL
Type
Full Planning Application
Applicant
Ms Isabel Kirk
Submitted
11 Apr 2025
Decision date
24 Jun 2025
Decision
Approved
Decision route
How long, really
11
wks · this application
Submission → decision · 3 wks over the 8-week target