Planning Application

2024/02008/FUL

114 Wormholt Road London W12 0LP

Full / Other PlanningWormholt ward
Submission
9 Aug 2024
Target
8 Jan 2028
Decision
8 Jan 2025
Outcome
Approved
Delegated decisionApproved
8 Jan 2025
Decided by George Shakir under delegated powers
Loading map…
Scheme description

Erection of a single storey side extension; erection of a single storey rear extension.

Parties
Applicant
Mr and Mrs Thileepan
Timeline
9 Aug 2024
Application submitted
12 Aug 2024
Application validated
8 Jan 2025
Delegated decision: Approved
Supporting documents · 20
PFSS-114-WORMHOLT-ROAD-W12-0LPView ↗
DESIGN-AND-ACCESS-STATEMENTView ↗
P24-66.1-THILEEPAN-(114-WORMHOLT-ROAD-W12-0LP-PLANS.REV.AView ↗
LAYOUT-PLAN---EXISTING_INCLUDED_IN_BLOCK-PLAN-OF-THE-SITEView ↗
LAYOUT-PLAN---PROPOSED_INCLUDED_IN_BLOCK-PLAN-OF-THE-SITEView ↗
SITEBLOCK-PLAN---EXISTING_INCLUDED_IN_BLOCK-PLAN-OF-THE-SITEView ↗
THE-LOCATION-PLAN_INCLUDED_IN_BLOCK-PLAN-OF-THE-SITEView ↗
P24-66.2-THILEEPAN-(114-WORMHOLT-ROAD-W12-0LP-ELEVATIONS.REVView ↗
ELEVATION-(FRONT)---PROPOSED_INCLUDED_IN_ELEVATION-(FRONT)--View ↗
ELEVATION-(REAR)---EXISTING_INCLUDED_IN_ELEVATION-(FRONT)---View ↗
ELEVATION-(REAR)---PROPOSED_INCLUDED_IN_ELEVATION-(FRONT)---View ↗
ELEVATION-(SIDE)---EXISTING_INCLUDED_IN_ELEVATION-(FRONT)---View ↗
ELEVATION-(SIDE)---PROPOSED_INCLUDED_IN_ELEVATION-(FRONT)---View ↗
PROPOSED-SIDE-AND-REAR-ELEVATION-AND-PROPOSED-FLOOR-PLANSView ↗
PROPOSED-SIDE-AND-REAR-ELEVATION-AND-PROPOSED-FLOOR-PLANSView ↗
REVISED-FLOOR-PLANS-AND-ELEVATIONSView ↗
REVISED-FLOOR-PLANS-AND-ELEVATIONSView ↗
PER.FULL-PLANNING-PERMISSIONView ↗
DELEGATED-REPORT-TEMPLATE---LIVEView ↗
View Application Page ↗
Data from the Hammersmith And Fulham planning register.
Summary
Reference
2024/02008/FUL
Type
Full Planning Application
Applicant
Mr and Mrs Thileepan
Submitted
9 Aug 2024
Decision date
8 Jan 2025
Decision
Approved
Decision route
How long, really
22
wks · this application
Submission → decision · 14 wks over the 8-week target