Planning Application

2024/01766/FUL

18 Daffodil Street London W12 0TG

Full / Other PlanningWormholt ward
Submission
16 Jul 2024
Target
10 Jan 2028
Decision
10 Jan 2025
Outcome
Approved
Delegated decisionApproved
10 Jan 2025
Decided by George Shakir under delegated powers
Loading map…
Scheme description

Erection of a single storey rear extension, replacing existing conservatory extension; installation of 3no. rooflights to the rear roofslope; installation of a new window to the side elevation at ground floor level within existing enclosed side alley.

Parties
Applicant
Ms YINGYING ZHANG
Timeline
16 Jul 2024
Application submitted
17 Jul 2024
Application validated
10 Jan 2025
Delegated decision: Approved
Supporting documents · 38
125 of 38
ELEVATION-(REAR)---PROPOSED_INCLUDED_IN_ELEVATION-(FRONT)---View ↗
ELEVATION-(REAR)---EXISTING_INCLUDED_IN_ELEVATION-(FRONT)---View ↗
ELEVATION-(SIDE)---EXISTING_INCLUDED_IN_ELEVATION-(FRONT)---View ↗
ELEVATION-(SIDE)---PROPOSED_INCLUDED_IN_ELEVATION-(FRONT)---View ↗
SECTION---PROPOSED_INCLUDED_IN_SECTION---EXISTINGView ↗
ROOF-PLAN---PROPOSED_INCLUDED_IN_ROOF-PLAN---EXISTINGView ↗
SITEBLOCK-PLAN---EXISTING_INCLUDED_IN_BLOCK-PLAN-OF-THE-SITEView ↗
THE-LOCATION-PLAN_INCLUDED_IN_BLOCK-PLAN-OF-THE-SITEView ↗
ELEVATION-(REAR)---PROPOSED_INCLUDED_IN_ELEVATION-(FRONT)---View ↗
ELEVATION-(SIDE)---PROPOSED_INCLUDED_IN_ELEVATION-(FRONT)---View ↗
PROPOSED-ROOF,-ELEVATIONS,-GROUND-FLOOR,--SECOND-(-LOFT)-FLOView ↗
PROPOSED-ROOF,-ELEVATIONS,-GROUND-FLOOR,--SECOND-(-LOFT)-FLOView ↗
PROPOSED-ROOF,-ELEVATIONS,-GROUND-FLOOR,--SECOND-(-LOFT)-FLOView ↗
PROPOSED-ROOF,-ELEVATIONS,-GROUND-FLOOR,--SECOND-(-LOFT)-FLOView ↗
PROPOSED-ROOF,-ELEVATIONS,-GROUND-FLOOR,--SECOND-(-LOFT)-FLOView ↗
PROPOSED-ROOF,-ELEVATIONS,-GROUND-FLOOR,--SECOND-(-LOFT)-FLOView ↗
View Application Page ↗
Data from the Hammersmith And Fulham planning register.
Summary
Reference
2024/01766/FUL
Type
Full Planning Application
Applicant
Ms YINGYING ZHANG
Submitted
16 Jul 2024
Decision date
10 Jan 2025
Decision
Approved
Decision route
How long, really
25
wks · this application
Submission → decision · 17 wks over the 8-week target