Planning Application
2023/03303/FUL
95 Hazlebury Road London SW6 2LX
Full / Other PlanningSands End ward
Submission
20 Dec 2023
Target
15 Feb 2027
Decision
15 Feb 2024
Outcome
Approved
Delegated decisionApproved
15 Feb 2024Decided by Nurgul Kinli under delegated powers
Loading map…
Scheme description
Erection of a rear extension at second floor level, on top of the existing back addition; infilling of 1no rooflight and installation of 2no new rooflights in the front roofslope and 1no rooflight above the main flat roof at roof level; alterations to the roof of lower ground floor back addition to include the installation of a new rooflight; replacement of window with a new uPVC window at upper ground floor level and second floor level to the rear elevation.
Parties
Timeline
20 Dec 2023
Application submitted
21 Dec 2023
Application validated
15 Feb 2024
Delegated decision: Approved
Supporting documents · 23
CIL_FORMView ↗
SITELOCATIONView ↗
LOCATIONPLANView ↗
FLOOD-RISK-ASSESSMENTView ↗
FRAView ↗
PLANNING-FIRE-SAFETY-STATEMENTView ↗
PP-01-3772-95-HAZ-EXISTING-LOWER-GROUND-FLOOR-PLANView ↗
PP-02-3772-95-HAZ-EXISTING-GROUND-FLOOR-PLANView ↗
PP-03-3772-95-HAZ-EXISTING-FIRST-FLOOR-PLANView ↗
PP-04-3772-95-HAZ-EXISTING-LOFT-FLOOR-PLANView ↗
PP-05-3772-95-HAZ-EXISTING-ROOF-TOP-PLANView ↗
PP-06-3772-95-HAZ-EXISTING-ELEVATIONS-AND-SECTIONView ↗
PP-07-3772-95-HAZ-PROPOSED-LOWER-GROUND-FLOOR-PLANView ↗
PP-08-3772-95-HAZ-PROPOSED-GROUND-FLOOR-PLANView ↗
PP-09-3772-95-HAZ-PROPOSED-FIRST-FLOOR-PLANView ↗
PP-10-3772-95-HAZ-PROPOSED-LOFT-FLOOR-PLANView ↗
PP-11-3772-95-HAZ-PROPOSED-ROOF-TOP-PLANView ↗
PP-12-3772-95-HAZ-PROPOSED-ELEVATIONS-AND-SECTIONView ↗
PP-13-3772-95-HAZ-EXISTING-AND-PROPOSED-SITE-BLOCK-PLANSView ↗
DESIGN-STATEMENTView ↗
OFFICER-S-FILE-NOTEView ↗
PER.FULL-PLANNING-PERMISSIONView ↗
DELEGATED-REPORT-TEMPLATE---LIVEView ↗
View Application Page ↗
Data from the Hammersmith And Fulham planning register.
Summary
Reference
2023/03303/FUL
Ward
Type
Full Planning Application
Applicant
Peter Highmore
Submitted
20 Dec 2023
Decision date
15 Feb 2024
Officer
Council
Decision
Approved
Decision route
—
How long, really
8
wks · this application
Submission → decision