Planning Application

2023/02152/FUL

28 Wendell Mews London W12 9BG

Full / Other PlanningWendell Park ward
Submission
16 Aug 2023
Target
6 Mar 2028
Decision
6 Mar 2025
Outcome
Approved
Delegated decisionApproved
6 Mar 2025
Decided by George Shakir under delegated powers
Loading map…
Scheme description

Erection of a new lean-to roof over the existing terrace to the rear at first floor level to form a habitable room; erection of a staircase enclosure and erection of 1.7m obscure glazing around part of the roof of the main building, in connection with for formation of a roof terrace; replacement of existing obscure glazed windows with new half obscure glazed windows at first floor level to the front elevation.

Parties
Applicant
Mr Daniel Coyle
Agent
Timeline
16 Aug 2023
Application submitted
18 Aug 2023
Application validated
6 Mar 2025
Delegated decision: Approved
Supporting documents · 37
125 of 37
04-PROPOSED-ELEVATIONSView ↗
05---PROPOSED-PLANSView ↗
03---EXISTING-PLANSView ↗
02---EXISTING-ELEVATIONSView ↗
01---SITE-LOCATIONView ↗
SITEBLOCK-PLAN---EXISTING_INCLUDED_IN_THE-LOCATION-PLANView ↗
FORM_1_CIL_ADDITIONAL_INFORMATIONView ↗
THE-LOCATION-PLAN_INCLUDED_IN_THE-LOCATION-PLANView ↗
ADDITIONAL-PLANS_INCLUDED_IN_THE-LOCATION-PLANView ↗
ADDITIONAL-PLANS_INCLUDED_IN_LAYOUT-PLAN---EXISTINGView ↗
ADDITIONAL-PLANS_INCLUDED_IN_LAYOUT-PLAN---EXISTING_19725333View ↗
ADDITIONAL-PLANS_INCLUDED_IN_LAYOUT-PLAN---PROPOSEDView ↗
ADDITIONAL-PLANS_INCLUDED_IN_LAYOUT-PLAN---PROPOSED_19725373View ↗
OS-MAP-OUTLINED-IN-REDView ↗
PROPOSALView ↗
APPLICATIONFORMREDACTEDView ↗
FEECALCULATIONView ↗
ATTACHMENTSUMMARYView ↗
01---SITE-LOCATIONView ↗
FORM_1_CIL_ADDITIONAL_INFORMATIONView ↗
03---EXISTING-PLANSView ↗
02---EXISTING-ELEVATIONSView ↗
04-PROPOSED-ELEVATIONSView ↗
05---PROPOSED-PLANSView ↗
SITEBLOCK-PLAN---EXISTING_INCLUDED_IN_THE-LOCATION-PLANView ↗
View Application Page ↗
Data from the Hammersmith And Fulham planning register.
Summary
Reference
2023/02152/FUL
Type
Full Planning Application
Applicant
Mr Daniel Coyle
Submitted
16 Aug 2023
Decision date
6 Mar 2025
Decision
Approved
Decision route
How long, really
81
wks · this application
Submission → decision · 73 wks over the 8-week target