Development Intent
Planning AtlasHammersmith And FulhamAddisonApplication
Planning Application

2022/02840/FUL

19 Cromwell Grove London W6 7RQ

Full / Other PlanningAddison ward
Submission
4 Oct 2022
Target
9 Dec 2025
Decision
9 Dec 2022
Outcome
Approved
Delegated decisionApproved
9 Dec 2022
Decided by Zhirong Li under delegated powers
Loading map…
Scheme description

Erection of rear and side dormer roof extensions; erection of a rear extension at third floor level, on top of the existing three storey back addition; installation of a rooflight in the front roofslope; installation of a new window, to the rear elevation between ground and first floor level; repositioning and replacement of a lantern rooflight, on top of the flat roof of ground floor back addition.

Parties
Applicant
Man Fung Tang
Officer
Zhirong Li
Timeline
4 Oct 2022
Application submitted
14 Oct 2022
Application validated
9 Dec 2022
Delegated decision: Approved
Supporting documents · 21
PROPOSED-DRAWINGSView ↗
DESIGN-AND-ACCESS-STATEMENTView ↗
EXISTING-DRAWINGSView ↗
FIRE-STATEMENT---19-CROMWELL-GROVEView ↗
LOCATION-PLANView ↗
SUPERSEDED-AMENDED-PROPOSED-FLOOR-PLANSView ↗
SUPERSEDED-PROPOSED-DRAWINGSView ↗
SUPERSEDED-AMENDED-PROPOSED-EAST-SIDE-ELEVATIONView ↗
SUPERSEDED-AMENDED-PROPOSED-FRONT--and--REAR-ELEVATIONSView ↗
FIRE-STATEMENT---19-CROMWELL-GROVEView ↗
DESIGN-AND-ACCESS-STATEMENTView ↗
PROPOSALView ↗
LOCATION-PLANView ↗
ATTACHMENTSUMMARYView ↗
FEECALCULATIONView ↗
EXISTING-DRAWINGSView ↗
2022.12.01_19-CROMWELL-GROVE-PROPOSED-DRAWINGSView ↗
DELEGATED-REPORT-TEMPLATE---LIVEView ↗
PER.FULL-PLANNING-PERMISSIONView ↗
View Application Page ↗
Data from the Hammersmith And Fulham planning register.
Summary
Reference
2022/02840/FUL
Type
Full Planning Application
Applicant
Man Fung Tang
Submitted
4 Oct 2022
Decision date
9 Dec 2022
Officer
Decision
Approved
Decision route
How long, really
9
wks · this application
Submission → decision · 1 wks over the 8-week target