Planning Application
2022/00952/LBC
21 Shepherd's Bush Place London W12 8LX
Listed BuildingShepherd's Bush Green ward
Submission
1 Apr 2022
Target
30 May 2025
Decision
30 May 2022
Outcome
Approved
Delegated decisionApproved
30 May 2022Decided by Zhirong Li under delegated powers
Loading map…
Scheme description
External alterations to include, alterations to the front and rear roofslopes including replacement of synthetic slate roof covering with riven synthetic slate roof and ridge tiles, replacement of existing sarking felt underneath with appropriate grade sarking felt of a non-breathable variety, installation of lead flashings and soakers in to parapet walls on both sides; reprofiling of the flat roof of existing two storey back addition to include replacement of felt flat roof covering with lead-grey single-ply membrane and installation of lead flashings and new under-decking beneath eaves tile at intersection between flat and pitched roof; internal alterations to include, replacement of exist
Parties
Applicant
Ms Janet BignellOfficer
Zhirong LiTimeline
1 Apr 2022
Application submitted
4 Apr 2022
Application validated
30 May 2022
Delegated decision: Approved
Supporting documents · 19
2201_122A_REARELEVEXISTINGDRAFTView ↗
2201_322A_REARELEVPROPOSEDDRAFTView ↗
2201_311_1STFLOORPROPOSEDView ↗
21-SHEPHERDS-BUSH-PLACE-LONDON-(UPDATED)28.03.2022View ↗
JAA_SITEINSPECTIONRECORD01_ROOF_220107View ↗
2201_120A_FRONTELEVEXISTINGDRAFTView ↗
2201_320A_FRONTELEVPROPOSEDDRAFTView ↗
2201_101_BLOCKPLANEXISTINGView ↗
2201-3.1_220329_D-ASTATEMENTJAView ↗
2201_313A_ROOFPLANPROPOSEDDRAFTView ↗
2201_113A_ROOFPLANEXISTINGDRAFTView ↗
2201_310_GROUNDFLOORPROPOSEDView ↗
2201_110_GROUNDFLOOREXISTINGView ↗
2201_111_1STFLOOREXISTINGView ↗
2201_1.2_DWGISSUESHEET_220329View ↗
2201_3.1_220329_LBCAPPLICATIONCOVERLETTERView ↗
2201_100_LOCATIONPLANEXISTINGView ↗
DELEGATED-OFFICER-REPORTView ↗
PER.-LISTED-BUILDING-CONSENTView ↗
View Application Page ↗
Data from the Hammersmith And Fulham planning register.
Summary
Reference
2022/00952/LBC
Type
Listed Building Consent
Applicant
Ms Janet Bignell
Submitted
1 Apr 2022
Decision date
30 May 2022
Officer
Council
Decision
Approved
Decision route
—
How long, really
8
wks · this application
Submission → decision