Planning Application
2022/00683/FUL
Ground Floor Flat And First Floor Flat 30 Askew Crescent London W12 9DP
Full / Other PlanningAskew ward
Submission
10 Mar 2022
Target
13 Oct 2025
Decision
13 Oct 2022
Outcome
Approved
Delegated decisionApproved
13 Oct 2022Decided by Zhirong Li under delegated powers
Loading map…
Scheme description
Replacement of existing single glazed timber windows with double glazed timber windows to the front and side elevations; replacement of existing single glazed timber windows with double glazed uPVC windows to the rear elevation; and replacement of timber door with a new timber door to the front elevation.
Parties
Timeline
10 Mar 2022
Application submitted
11 Mar 2022
Application validated
13 Oct 2022
Delegated decision: Approved
Supporting documents · 23
SUPERSEDED-ELEVATION-DRAWINGS,-30-ASKEW-CRESCENT,-LONDON,-W1View ↗
SUPERSEDED-APPLICATIONFORMREDACTEDView ↗
SUPERSEDED-REHAU-SPECIFIER-GUIDE-BROCHURE_OPTView ↗
SUPERSEDED-PS_D-AND-A-STATEMENT_30-ASKEW-CRESCENT(2)View ↗
SUPERSEDED-APPLICATIONFORMView ↗
SUPERSEDED-PS_D-AND-A-STATEMENT_30-ASKEW-CRESCENT(1)View ↗
30-ASKEW-CRESCENT_LOCATION-PLANView ↗
FEECALCULATIONView ↗
30-ASKEW-CRESCENT_SITE-PLAN(1)View ↗
ATTACHMENTSUMMARYView ↗
TOTAL70-BROCHUREView ↗
SUPERSEDED-PS_D-AND-A-STATEMENT_V2_30-ASKEW-CRESCENTView ↗
TIMBAWOOD_HERITAGE_FULL-SLIDING_SASH_WINDOWView ↗
REHAU-HERITAGE-VERTICAL-SLIDER-SPECIFICATION-FLYERView ↗
SUPERSEDED-ELEVATION-DRAWINGS,-V2_30-ASKEW-CRESCENT,-LONDON,View ↗
TW_M1030-TRADITIONAL-RANGE-BROCHURE-1View ↗
SUPERSEDED-PS_D-AND-A-STATEMENT_V3_30-ASKEW-CRESCENTView ↗
SUPERSEDED-ELEVATION-DRAWINGS,-V3_30-ASKEW-CRESCENT,-LONDON,View ↗
ELEVATION-DRAWINGS,-V4_FINAL_30-ASKEW-CRESCENT,-LONDON,-W12-View ↗
PS_D-AND-A-STATEMENT_V4_FINAL_30-ASKEW-CRESCENTView ↗
30-ASKEW-CRESCENT,-H5390FORM001_ENGLAND_EN_AMView ↗
PER.FULL-PLANNING-PERMISSIONView ↗
DELEGATED-REPORT-TEMPLATE---LIVEView ↗
View Application Page ↗
Data from the Hammersmith And Fulham planning register.
Summary
Reference
2022/00683/FUL
Ward
Type
Full Planning Application
Applicant
NHG
Submitted
10 Mar 2022
Decision date
13 Oct 2022
Officer
Council
Decision
Approved
Decision route
—
How long, really
31
wks · this application
Submission → decision · 23 wks over the 8-week target