Development Intent
Planning AtlasHammersmith And FulhamParsons Green And WalhamApplication
Planning Application

2021/04138/FUL

263 New King's Road London SW6 4RB

Full / Other PlanningParsons Green And Walham ward
Submission
23 Dec 2021
Target
31 May 2025
Decision
31 May 2022
Outcome
Approved
Delegated decisionApproved
31 May 2022
Decided by Sinead Winship David under delegated powers
Loading map…
Scheme description

Change of use of part of ground floor and basement from retail (Class E) into 1 x 1 bedroom self-contained flat (Class C3); erection of rear extensions at third floor (pod) and first floor levels in connection with the conversion of first, second and third floor level into 2 x 2 bedroom self-contained flats; installation of 3no rooflights in the front roofslope and 1no rooflight above the main flat roof at roof level; replacement of existing windows with new windows to the side and rear of first and second floor back additions; replacement of existing dormer window with a new dormer window in the rear roofslope; alterations and increasing the roof of second floor rear back addition; formatio

Parties
Timeline
23 Dec 2021
Application submitted
24 Dec 2021
Application validated
31 May 2022
Delegated decision: Approved
Supporting documents · 16
PROPOSED-DRAWINGSView ↗
1929_NEW_KINGS_ROAD_FLOOD_RISK_ASSESSMENTView ↗
1929_EX_002_NEW_KINGS_ROAD_BLOCK_PLANView ↗
1929_NEW_KINGS_ROAD_DESIGN_ACCESS_STATEMENTView ↗
1929_EX_000_NEW_KINGS_ROAD_EXISTINGView ↗
1929_NEW_KINGS_ROAD_CILView ↗
1929_EX_000_NEW_KINGS_ROAD_SITE_LOCATION_PLANView ↗
OFFICER-S-FILE-NOTEView ↗
DAYLIGHT-SUNLIGHT-RESULTSView ↗
PROPOSED-BASEMENT-FLOOR-PLANView ↗
DAYLIGHT-SUNLIGHT-SUMMARYView ↗
PROPOSED-DRAWINGSView ↗
PROPOSED-FRONT-ELEVATIONView ↗
PROPOSED-SECOND-FLOOR-PLANView ↗
PER.FULL-PLANNING-PERMISSIONView ↗
DELEGATED-OFFICER-REPORTView ↗
View Application Page ↗
Data from the Hammersmith And Fulham planning register.
Summary
Reference
2021/04138/FUL
Type
Full Planning Application
Applicant
Salisbury Development Group Ltd
Submitted
23 Dec 2021
Decision date
31 May 2022
Decision
Approved
Decision route
How long, really
23
wks · this application
Submission → decision · 15 wks over the 8-week target