Planning Application
2021/04032/FUL
22 And 22A Collingbourne Road London W12 0JQ
Full / Other PlanningWormholt ward
Submission
16 Dec 2021
Target
24 May 2025
Decision
24 May 2022
Outcome
Approved
Delegated decisionApproved
24 May 2022Decided by Zhirong Li under delegated powers
Loading map…
Scheme description
Erection of a single storey rear extension, to the side and rear of the existing back addition; erection of glass screening over part of the proposed single storey rear extension in connection with the formation of a roof terrace; installation of sliding doors to the rear of the first floor back addition to provide access to the proposed roof terrace following the removal of an existing window; replacement of an existing window to the rear of the first floor back addition; removal of an existing window to the side of the first back addition; erection of a rear extension at second floor level over part of the existing back addition; alterations to part of the roof of the back addition at seco
Parties
Timeline
16 Dec 2021
Application submitted
4 Jan 2022
Application validated
24 May 2022
Delegated decision: Approved
Supporting documents · 18
21-037-ST2-01View ↗
S159-21---EX02View ↗
S159-21---EX01View ↗
S159-21---EX03View ↗
21-037-ST2-02View ↗
LOCATION--and--SITE-PLANView ↗
EXISTING-SECTIONSView ↗
PROPOSED-GROUND--and--FIRST-FLOOR-PLANView ↗
PROPOSED-SECOND-FLOOR--and--ROOF-PLANView ↗
EXISTING-FLOOR-PLANSView ↗
PROPOSED-COURTYARD-ELEVATIONS-A--and--BView ↗
PHOTOGRAPHSView ↗
SUPERSEDED-PROPOSED-ELEVATIONSView ↗
EXISTING-ELEVATIONSView ↗
PROPOSED-PARTY-WALL-ELEVATIONView ↗
PROPOSED-ELEVATIONSView ↗
DELEGATED-REPORT-TEMPLATE---LIVEView ↗
PER.FULL-PLANNING-PERMISSIONView ↗
View Application Page ↗
Data from the Hammersmith And Fulham planning register.
Summary
Reference
2021/04032/FUL
Ward
Type
Full Planning Application
Applicant
RUSS CONTRACTOR
Submitted
16 Dec 2021
Decision date
24 May 2022
Officer
Council
Decision
Approved
Decision route
—
How long, really
23
wks · this application
Submission → decision · 15 wks over the 8-week target