Development Intent
AtlasHackneyOfficersAbbas Sabir
Case officer · Hackney Planning

Abbas Sabir.

Last recorded decision Apr 2020 — no decisions in this record since

A case officer at Hackney with an approval rate of 80% across 7 decided planning applications, spanning 5 wards.[1] Decision speed and appeal performance publish when decision notices are ingested.

Planning officer7 decisions80% approvalSave
Hackney · ward map
Approval rate — by ward
Lower ~68%
Higher ~90%
ShowingAll years · subscriber →across all years on record — a period re-scopes the headline figures and the trend
At a glanceEach metric links to the investigation behind it
All investigations →
7
Applications
2020
Approval rate over time — tougher or softer 🔒Dashed line = London average

Not enough dated decisions for a trend yet.

What they decide — by application type
How they compareVersus peers
Approval rate80% · 22nd of 52
higher is betterdashed = London avg
Decision time · publishes with decision notices
in development
Appeal overturn · publishes with decision notices
in development
How this officer decides — from their own reports51 officer reports parsed
0%
Approves despite concerns
of approvals record a documented reservation
11%
Negotiated approvals
approvals mentioning revisions/amendments
0%
"On balance" reports
reports using explicit balancing language
49%
Bespoke reasoning
of report text written for the case, not recited
What they write about — vs Hackney's average officer

Topic mentions per 1,000 words of their own report text (boilerplate stripped), indexed against all parsed Hackney reports. Attention, not stance.

Outlook & amenity
1.65× borough avg

Mark = borough average (1×). Bar capped at 2×.

How they reason — coded from their reports

Sabir's rear-extension casework runs the cumulative arithmetic of ALL developed rear-garden area across multiple past permissions on the same site (infill, outbuilding, new extension summed together) before judging acceptability, rather than assessing the newest element alone.

Observable habits

· sums the total developed rear-garden area across ALL past and proposed structures on a site (infill + outbuilding + new extension) before judging acceptability

· tests both the plan-level and elevation-level 45-degree rule separately against each adjoining neighbour, noting where they diverge

· cites the exact prior approved scheme's dimensions as the direct numeric benchmark for the current, larger proposal

What their reports consistently look for

· what this officer's reports consistently look for: the TOTAL cumulative developed area of the rear garden across every past and proposed structure on the site, not just the current proposal in isolation

· what this officer's reports consistently look for: whether the 45-degree rule is breached in plan but not elevation (or vice versa) for each specific adjoining neighbour

· what this officer's reports consistently look for: the exact dimensions of a directly prior approved scheme on the same site as the numeric benchmark for the current proposal

Assigned Abbas Sabir on a live case?What they pay attention to, how they reason, and what their reports consistently look for — so you can address it before they raise it.Subscribe to unlock →
In their own words

This proposal combined with the implemented rear infill side extension, and outbuilding would result in approximately 54.9 sq. m of the rear garden being developed. Prior to the implemented infill side extension, and outbuilding, the rear garden was approximately 83.05 sq.m.

2020/0568

the proposed rear extension would breach the 45 degree rule at plan level, but would not breach the 45 degree rule at elevation level. Given that the proposed extension would have a flat roof, and that the rear of these properties are east-facing, the potential loss of light and outlook to this neighbour as a result of this rear extension would be limited.

2020/0568

The proposed extension is approximately 6 sq. m larger than the approved single storey rear extension approved under the prior approval 2019/4153.

2020/0568

Measured from 51 published Hackney officer reports written by this officer, with recited policy boilerplate stripped before any counting. These describe how this officer works and writes — they are not outcome predictions. Every quote is from a named public report.

Policy playbook — what this officer cites[3]

The policies this officer cites most in their own reports — times cited across 51 parsed reports. Whether refusals citing each survive appeal isn't traced per policy yet.

7.4
2 times cited
7.6
2 times cited
DM1
2 times cited
DM2
2 times cited
7.8
1 times cited
CS24
1 times cited
CS25
1 times cited
DM28
1 times cited
Which policies this officer leans on is subscriber intelligenceSubscribe to unlock →
Decisions by ward

Where this officer's caseload concentrates, 2020.[1] Click the map above to focus this page on a ward, or a row to open the ward.

Recent applications
Address
Reference
Type
Outcome
Date
2020/1321
Householder Planning
Approved
2020-06-24
2020/1197
Householder Planning
Approved
2020-06-18
2020/1321
Householder Planning
Approved
2020-06-24
2020/1197
Householder Planning
Approved
2020-06-18
Full application history locked
Subscribe to see all 7 decisions →
Consultants approved most— subscriber data
1. Planning Advisory Ltd
2. SM Design Consultancy Studio
3. SAM Planning services
4. Prestige Planning Ltd.
At a glance
OfficerAbbas Sabir
BoroughHackney
RolePlanning officer
Experience
Applications7 (2020)
Approval rate80%
London approval avg81%
Who decides here
GovernmentMayor of LondonCouncilCommitteeOfficersDecisionsApplicantsInspectorate
Related investigations
When committees overrule officers like this one →
How often members depart from officer recommendations, and how those overrides fare at appeal.
How much gets decided without a committee →
The delegated share by borough and officer — where the real power over decisions sits.
Sources & method
  1. [1]Applications decided, approval rate, per-year trend and ward breakdown — London Borough of Hackney planning register and published decision notices, 2020. · methodology
  2. [2]Appeal overturn and decision-time benchmarks — Planning Inspectorate (PINS) appeal decisions and application date pairs; not yet computed per officer, shown as a dash until they are. · PINS appeals casework
  3. [3]Condition load — mean effective conditions attached to Hackney decision notices (grant/split), parsed from the published notice text; a borough figure, not yet split per case officer.
  4. [4]"How this officer decides", the policy playbook and all quotes — parsed from 51 published Hackney officer reports written by this officer, recited policy boilerplate stripped before counting; disposition text coded from their own reasoning with every quote machine-verified verbatim. Descriptive of how they work — not outcome predictions.
Methodology is published in full so every number is traceable to its primary source.