Andrew Parker.
Recently active — last recorded decision May 2025
A case officer at Enfield with an approval rate of 58% across 293 decided planning applications, spanning 32 wards.[1] Decision speed and appeal performance publish when decision notices are ingested.
Topic mentions per 1,000 words of their own report text (boilerplate stripped), indexed against all parsed Enfield reports. Attention, not stance.
Mark = borough average (1×). Bar capped at 2×.
Parker writes narrative reports on major/committee-level schemes and specifically cross-checks the planning history for previously imposed conditions that were never discharged (e.g. tree-protection foundation details), treating an undischarged condition on a related earlier permission as live evidence bearing on the current scheme.
· checks whether a condition imposed on an earlier related permission was actually complied with, using non-compliance as evidence against the current scheme
· identifies council-owned street trees specifically as a public amenity asset warranting protection independent of any TPO designation
· runs full S106/CIL affordable-housing and education-contribution tests even where the ultimate conclusion is refusal on design grounds
· what this officer's reports consistently look for: whether conditions imposed on an earlier related permission on the same site were actually discharged, using any shortfall as evidence for the current assessment
· what this officer's reports consistently look for: whether council-owned trees on the highway verge, not just TPO trees, would be affected by the works
· what this officer's reports consistently look for: the full S106/CIL contribution calculation, run through even where the recommendation is ultimately refusal
“Planning application ref15/02484/HOU was refused as the proposed single-storey side and rear extension would significantly harm the roots of trees located on the highways. A subsequent planning application for a side and rear extension was approved subject to a condition 5”
20/00125/HOU
“6.11 Arboricultural Officers have previously identified that there are several significant trees located on the highways owned verge directly adjacent to the proposed development area. 6.12 These trees are local authority owned and are of significant public amenity value”
20/00125/HOU
Measured from 150 published Enfield officer reports written by this officer, with recited policy boilerplate stripped before any counting. These describe how this officer works and writes — they are not outcome predictions. Every quote is from a named public report.
The policies this officer cites most in their own reports — times cited across 150 parsed reports. Whether refusals citing each survive appeal isn't traced per policy yet.
Show all 32 rows
Where this officer's caseload concentrates, 2020–25.[1] Click the map above to focus this page on a ward, or a row to open the ward.
- [1]Applications decided, approval rate, per-year trend and ward breakdown — London Borough of Enfield planning register and published decision notices, 2020–25. · methodology
- [2]Appeal overturn and decision-time benchmarks — Planning Inspectorate (PINS) appeal decisions and application date pairs; not yet computed per officer, shown as a dash until they are. · PINS appeals casework
- [3]Condition load — mean effective conditions attached to Enfield decision notices (grant/split), parsed from the published notice text; a borough figure, not yet split per case officer.
- [4]"How this officer decides", the policy playbook and all quotes — parsed from 150 published Enfield officer reports written by this officer, recited policy boilerplate stripped before counting; disposition text coded from their own reasoning with every quote machine-verified verbatim. Descriptive of how they work — not outcome predictions.