Development Intent
Planning AtlasEnfieldArnos GroveApplication
Planning Application

26/00778/FUL

358A Bowes Road London N11 1AN

Full / Other PlanningArnos Grove wardLondon Heathrow Airport: Maximum Height Level: All buildings
Submission
27 Feb 2026
Target
8 May 2026
Decision
8 May 2026
Outcome
Refused
Delegated decisionRefused
8 May 2026
Decided by Edith Leung under delegated powers
Loading map…
Scheme description

Construction of 1-bed dwelling at rear first floor roof area with hipped roof over with associated cycling parking and refuse storage. Removal of rear flue (amended description)

Why it was refused
Reason 1

The proposed development, by virtue of its orientation, materiality and design, massing and roof form would appear visually intrusive, incongruous, overly dominant and out of keeping with the character and appearance of the host building and the surrounding area of which it forms part. The proposal is therefore contrary to Section 12 of the National Planning Policy Framework (2024), Policies D4, D5 of the London Plan (2021), CP30 of the Enfield Core Strategy (2010), DMD6, DMD8 and DMD37 of the Enfield Development Management Document (2014).

Reason 2

The proposed development, by virtue of it siting would cause poor outlook, privacy concern, unacceptable noise, vibration and odour, resulting in substandard and inappropriate accommodation incapable of meeting the reasonable needs of occupiers, contrary to Section 12 of the National Planning Policy Framework (2024), to Policies D3, D6 and D11, D13 and D14 of the London Plan (2021), to Policies CP4 and CP30 of the Enfield Core Strategy (2010), to Policies DMD6, DMD8, DMD37, DMD64 and DMD68 of the Enfield Development Management Document (2014), and the Housing Design Standards London Plan Guidance (2023).

Reason 3

The proposed development, by virtue of its proximity to the boundary and inadequate separation distances, would result in unacceptable overlooking, loss of light and loss of privacy to existing and future residents of neighbouring properties, contrary to Section 12 of the National Planning Policy Framework (2024), Policies D3 and D6 of the London Plan (2021), Policy CP30 of the Enfield Core Strategy (2010), Policies DMD6, DMD8, DMD10 and DMD37 of the Enfield Development Management Document (2014)

Reason 4

The proposed development, by virtue of the siting, location and design, fails to provide usable and accessible cycle parking and satisfactory refuse storage and collection arrangements. The poor layout would result in operational difficulties for waste collection and discourages cycle use, leading to the likelihood of refuse and cycles being placed on the public highway, causing obstruction and harm to pedestrian safety and highway operation. The proposal is therefore contrary to Policies T5 and SI7 of the London Plan (2021); Policies CP22, CP24, CP25 and CP26 of the Enfield Core Strategy (2010); Policies DMD45, DMD47 and DMD48 of the Enfield Development Management Document (2014); and the Council's Household Waste and Recycling Guidance for New Developments (2024). Dated: 8 May 2026 Authorised on behalf of: Karen Page Head of Planning and Building Control Housing, Regeneration and Development Department Enfield Council PO Box 53, Civic Centre Silver Street, Enfield EN1 3XE If you have any questions about this decision, please contact the planning officer edith.leung@enfield.gov.uk. List of plans and documents referred to in this Notice: Title/Number Version TYPE 200,201, 202, 204, 205, 206 Drawing 207 Drawing cycle storage Drawing bin storage Drawing energy statement Supporting Information highway proforma Supporting Information Additional Information APPEAL GUIDANCE: Should you (an applicant or agent) feel aggrieved by the decision of the Council to either refuse permission or to grant permission subject to conditions, you can

Policies cited
National Planning Policy Framework 12
D4
D5
CP30
DMD6
DMD8
DMD37
NPPF
D3
D6
D11
D13
D14
CP4
DMD64
DMD68
DMD10
T5
SI7
CP22
CP24
CP25
CP26
DMD45
DMD47
DMD48
Parties
Applicant
P Thi
Timeline
27 Feb 2026
Application submitted
13 Mar 2026
Application validated
8 May 2026
Delegated decision: Refused
Supporting documents · 11
Decision Notice8 May 2026View ↗
Officer Report8 May 2026View ↗
Photo of rear elevation13 Mar 2026View ↗
Existing & Proposed Street Scene13 Mar 2026View ↗
Proposed Refuse/Recycling plans13 Mar 2026View ↗
Proposed Cycle Storage plans13 Mar 2026View ↗
Energy Statement13 Mar 2026View ↗
Highway safety proforma13 Mar 2026View ↗
APPLICATION FORM - WITHOUT PERSONAL DATA10 Mar 2026View ↗
OS, PLANNING STTAEMENT, EXISTING & PROPOSED PLANS27 Feb 2026View ↗
DETERMINING CIL LIABILITY27 Feb 2026View ↗
View Application Page ↗
Data from the Enfield planning register.
Summary
Reference
26/00778/FUL
Type
Full
Applicant
P Thi
Submitted
27 Feb 2026
Decision date
8 May 2026
Council
Decision
Refused
Decision route
Delegated (officer)
How long, really
10
wks · this application
Submission → decision · 2 wks over the 8-week target
Public response
Objections
0
In support
0
Total comments
0