25/00347/HOU
2 Clarendon Way London N21 2LX
Single storey side extension, conversion of garage into habitable room and single storey rear extension with a raised rear patio.
The proposed development, in the absence of a sufficient SuDs strategy and Flood Risk Assessment, fails to demonstrate how proposed measures manage the risk of flooding and utilise Sustainable Urban Drainage Systems (SuDS) following the drainage hierarchy in the London Plan. The proposal is therefore contrary to Section 14 of the National Planning Policy Framework (2024), to policies SI12 and SI 13 of the London Plan (2021), to policies CP21 and CP28 of the Enfield Core Strategy (2010), to policies DMD59, DMD60 and DMD61 of the Enfield Development Management Document (2014), and the Enfield Strategic Flood Risk Assessment. Dated: 26 March 2025 Authorised on behalf of: Karen Page Head of Planning and Building Control Housing, Regeneration and Development Department Enfield Council PO Box 53, Civic Centre Silver Street, Enfield EN1 3XE If you have any questions about this decision, please contact the planning officer Jeremiah.ayerh@enfield.gov.uk. List of plans and documents referred to in this Notice: Title/Number Version TYPE 390/02 C Drawing 390/01 D Drawing 390/52 E Drawing 390/51 E Drawing 390/53 A Drawing Location Plan Drawing 390/10B Drawing Flood Risk Assessment Supporting Information Additional Information APPEAL Should you (an applicant or agent) feel aggrieved by the decision of the Council to either refuse permission or to grant permission subject to conditions, you can