Development Intent
Planning AtlasEnfieldUpper EdmontonApplication
Planning Application

24/01297/FUL

81D Pretoria Road North London N18 1SP

Full / Other PlanningUpper Edmonton wardFlood Defence 100 year- 1000m: Name: Wood Green Model Descri
Submission
19 Apr 2024
Target
24 Jul 2024
Decision
25 Jul 2025
Outcome
Refused
Delegated decisionRefused
25 Jul 2025
Decided by Allison Russell under delegated powers
Loading map…
Scheme description

Erection of a three storey block of offices/workshop with associated car parking.

Why it was refused
Reason 1

The proposed office block and associated car park would result in the loss of land associated with industrial uses within the designated Locally Significant Industrial Site. The proposed development is therefore contrary to Policy E6 of the London Plan (2021), CP 15 of the Core Policy (2010), DMD 20 and DMD 23 of the Development Management Document (2014) and the NPPF (2024).

Reason 2

Insufficient information has been provided to demonstrate that any increase in on-street car parking would not adversely affect the local highway network nor has it been demonstrated that the proposed car park has the capacity to safely accommodate on-site car parking. Details of servicing arrangements and cycle parking have also not be provided and therefore, it has not been demonstrated adequate provision would be provided. As such, the proposal is contrary to Policies T5, T6.2 and T7 of the London Plan (2021), CP 24, CP25 of Core Policy (2010), DMD 23, 45, 46 and DMD 47 of the Development Management Document (2014) and the NPPF (2024).

Reason 3

Insufficient information has been provided to demonstrate the adequate, safe and functional provision is made for refuse collection. As such the proposal does not comply with Policies T2, T3, T4, T6, T6.1 and T7 of the London Plan (2021), CP22 of the Enfield Core Strategy (2010), DMD23, DMD45, DMD46, DMD47, DMD48 and DMD57of the Enfield Development Management Document (2014) and the Enfield Household Recycling and Waste Planning Guidance for New Developments (2024).

Reason 4

The proposed development, by virtue of its detailed design, namely comprising of extensive areas of solid facades with a lack of fenestration and rhythm to the proposed fenestration required to bring definition and visual interest would appear as a discordant form of development. The proposal fails to respect the rhythm, style and proportions of the building/group of buildings of which it would form a part of. As such, the proposed development is contrary to Policies D4 of the London Plan (2021), CP30 of Core Policy (2010) DMD23, DMD 37, DMD 39 of the Development Management Document (2014) and NPPF (2024).

Reason 5

Insufficient information has been submitted to ensure that the proposed development would incorporate a sustainable drainage system to ensure the effective management of surface water, which would reduce the risk of flooding, pollution and other environmental damage. As such the proposal is contrary to Policies SI 14, SI 13 of the London Plan (2021), CP 21 of Core Strategy (2010), DMD 59. DMD 60, DMD 61 of the Development Management Document (2014) and NPPF (2024).

Reason 6

In the absence of an ecology report, which includes ecological enhancements to improve the biodiversity offer on the site, it has not been demonstrated that the adjoining Wildlife Corridor would be adversely impacted by the proposal. The proposed development is therefore contrary to Policies G6 of the London Plan (2021), CP36 of Core Strategy (2010), DMD 74, DMD 79 of the Development Management Document (2014) and the NPPF (2024).

Reason 7

Insufficient information has been provided to demonstrate the maximum achievable energy efficiency achievable for the proposed development nor has it been demonstrated that the proposed development would provide for the maximum achievable improvements in the total CO2 emissions arising from the operation of a development and its services over part L of Building Regs 2013. As such, the proposed development is contrary to Policies CP 20 of Core Policy 20, DMD 49, DMD 51 and 53 of the Development Management Document (2014) and NPPF (2014).

Reason 8

In the absence of a BREEAM pre-assessment report, demonstrating that the proposed development is on target to achieve an 'Excellent' rating the proposal is contrary to Policies SI 5 of the London Plan (2021), DMD 49, DMD 50 and DMD 58 of the Development Management Document (2014). Dated: 25 July 2025 Authorised on behalf of: Karen Page Head of Planning and Building Control Housing, Regeneration and Development Department Enfield Council PO Box 53, Civic Centre Silver Street, Enfield EN1 3XE If you have any questions about this decision, please contact the planning officer allison.russell@enfield.gov.uk. List of plans and documents referred to in this Notice: Title/Number Version TYPE Location Plan Drawing Existing Block Plan Drawing Proposed Block Plan Drawing Proposed Office Elevations Drawing Proposed Floor Plans Drawing Proposed Upper Floor Plans Drawing Proposed Sections Drawing Sustainable Drainage Assessment 2024-05-24 Supporting Information BRUKL Output Document Supporting Information Additional Details on Project Parameters as Input by the Drawing Certifier Additional Information 1 The applicant is advised to arrange a formal pre application to discuss any future development on this site. Details of our pre application service can be found at: https://www.enfield.gov.uk/services/planning/planning-pre-application-advice-service APPEAL GUIDANCE: Should you (an applicant or agent) feel aggrieved by the decision of the Council to either refuse permission or to grant permission subject to conditions, you can

Policies cited
E6
DMD20
DMD23
NPPF
T5
T6.2
T7
Development Management Document 45
Development Management Document 46
DMD47
T2
T3
T4
T6
T6.1
CP22
D4
DMD37
DMD39
SI14
SI13
CP21
DMD60
DMD61
G6
CP36
DMD74
DMD79
Development Management Document 20
DMD49
DMD51
Development Management Document 53
SI5
DMD50
DMD58
Parties
Applicant
Mr John Charalambous
Timeline
19 Apr 2024
Application submitted
29 May 2024
Application validated
25 Jul 2025
Delegated decision: Refused
Supporting documents · 10
Decision Notice25 Jul 2025View ↗
Highway Safety impact Proforma29 May 2024View ↗
Proposed Sections28 May 2024View ↗
SBEM input28 May 2024View ↗
BRUKL Output28 May 2024View ↗
Cil form 128 May 2024View ↗
Suds Documents28 May 2024View ↗
APPLICATION FORM - WITHOUT PERSONAL DATA14 May 2024View ↗
The location plan19 Apr 2024View ↗
Proposed Elevations & Floor plans19 Apr 2024View ↗
View Application Page ↗
Data from the Enfield planning register.
Summary
Reference
24/01297/FUL
Type
Full
Applicant
Mr John Charalambous
Submitted
19 Apr 2024
Decision date
25 Jul 2025
Council
Decision
Refused
Decision route
Delegated (officer)
How long, really
66
wks · this application
Submission → decision · 58 wks over the 8-week target
Public response
Objections
0
In support
0
Total comments
0