23/03775/HOU
142 Wades Hill London N21 1EH
Installation of two pairs of vehicle gates across the main entrance at front, with railings at front and side to a maximum height of 2.04m at front and 1.65m at side.
The proposed railings and automated gate by virtue of it's design, materials proposed, and height would represent a visually obtrusive and discordant form of development which would detract from the open character and setting of the street scene. The proposal is therefore contrary to Policy CP30 of Enfield Core Strategy (2010), Policies DMD8 and DMD37 of the Enfield Development Management Document (2014).
The proposed development, by virtue of the lack of visual permeability, would give rise to conditions prejudicial to the free flow and safety of vehicular traffic and pedestrians, T 4 of the London Plan (2021), Policy CP 24 of the Enfield Core Strategy (2010), Policies DMD 46 and DMD 47 of the Enfield Development Management Document (2014) and the Revised Technical Standards for Footway Crossovers (2013) Dated: 9 February 2024 Authorised on behalf of: Karen Page Head of Planning and Building Control Housing, Regeneration and Development Department Enfield Council PO Box 53, Civic Centre Silver Street, Enfield EN1 3XE If you have any questions about this decision, please contact the planning officer eric.thompson@enfield.gov.uk. List of plans and documents referred to in this Notice: Title/Number Version TYPE J37586-PC-01 Drawing J37586-PC-03 Drawing J37586-PC-07 Drawing J37586-PC-05 Drawing J37586-PC-06 Drawing J37586-PC-02 Drawing J37586-PC-04 Drawing Additional Information APPEAL Should you (an applicant or agent) feel aggrieved by the decision of the Council to either refuse permission or to grant permission subject to conditions, you can